Hadron DAQ re-installation
From Hall A Wiki
Plan/Checklist for Re-Installing the BigBite Hadron DAQ (including Neutron Detector).
Hadron Package DAQ
- Remove all NIM/CAMAC/VME modules that will not be used.
- Replace Linear FI/FO in second NIM bin.
- Recable all dE linear sums (L+R) from 50/50 splitters and to CAMAC Discriminators
- Recable all E (dE) from x10 Amplifiers (50/50 splitters) to CAMAC Discriminators
- Verify mapping of E and dE delay line from x10 Amplifiers to VME ADCs.
- Cable E and dE scintillators from Hadron Package to DAQ Weldment Patch Panels
Neutron Detector DAQ
- Acquire 2 NIM bins (300W) from Electron Package Frontend
- Acquire 16 x10 Amplifiers (NIM Bin modules)
- Acquire 16 CAMAC Discriminators
- Acquire all patch cables
- 240 for Patch Panel to x10 Amp
- 240 for x10 Amp to discriminators
- 240 for x10 Amp to Delay Patch Panel
- Cable up and map all patch cables