January 17th 2025

From Hall A Wiki
Revision as of 12:15, 17 January 2025 by Camsonne (Talk | contribs) (Created page with "*Updates **CDet ***want to take cosmics ***all stuff mostly installed ***start to focus on DAQ and software ***module will be mounted next week ***external scintillators for t...")

(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to: navigation, search
  • Updates
    • CDet
      • want to take cosmics
      • all stuff mostly installed
      • start to focus on DAQ and software
      • module will be mounted next week
      • external scintillators for trigger : 4 - can read whole module or whole layer - installing the cables for the trigger - one ribbon cable and ribbon to BNC adapter - will pull longer BNC -
      • need LV for NINO and HV for PMTs : Ralph will check with Bob and Alex for CDet GUI - Layers and left and right - CDet1L0 to 41 - will give correspondance table - same as GEnRP polarimeter
      • picking up all LV boxes from Mark and will install
      • want to test layer 2 first : assume modules
      • need to set gate and reference channels
      • software needs first data file to work
      • DAQ : still need to put readout list - need
    • HCal
      • we had an issue with TI, put spare TI
      • issues with routerrrrer fixd
      • ready take data withCAl ter replacing TI again