- Updates
- CDet
- want to take cosmics
- all stuff mostly installed
- start to focus on DAQ and software
- module will be mounted next week
- external scintillators for trigger : 4 - can read whole module or whole layer - installing the cables for the trigger - one ribbon cable and ribbon to BNC adapter - will pull longer BNC -
- need LV for NINO and HV for PMTs : Ralph will check with Bob and Alex for CDet GUI - Layers and left and right - CDet1L0 to 41 - will give correspondance table - same as GEnRP polarimeter
- picking up all LV boxes from Mark and will install
- want to test layer 2 first : assume modules
- need to set gate and reference channels
- software needs first data file to work
- DAQ : still need to put readout list - need
- HCal
- we had an issue with TI, put spare TI
- issues with routerrrrer fixd
- ready take data withCAl ter replacing TI again
- CDet