Daily Run Plan
From Hall A Wiki
Back to DVCS
Start up run plan: plans for the very beginning of the data taking, data that can be taken without LHRS and cryo target.
Friday Oct 1 Swing and Oct 2 Owl
====================
1) Compton rates with laser and beam scan (Eric will lead this study in the backroom)
2) While Compton study takes place, take HRS cosmics data (CODA configuration: LeftHRS). Replay the data and page expert if something looks wrong
3) [1]BPM calibration
4) [Raster calibration]
5) Move back to empty target, and call MCC to request controlled access. You're free to go...