Daily Run Plan

From Hall A Wiki
Revision as of 18:09, 1 October 2010 by Munoz (Talk | contribs)

Jump to: navigation, search

Back to DVCS

Start up run plan: plans for the very beginning of the data taking, data that can be taken without LHRS and cryo target.

Friday Oct 1 Swing and Oct 2 Owl

====================

1) Compton rates with laser and beam scan (Eric will lead this study in the backroom)

2) While Compton study takes place, take HRS cosmics data (CODA configuration: LeftHRS). Replay the data and page expert if something looks wrong

3) [1]BPM calibration

4) [Raster calibration]

5) Move back to empty target, and call MCC to request controlled access. You're free to go...