Daily Run Plan

From Hall A Wiki
Revision as of 01:10, 4 December 2010 by Hisham (Talk | contribs)

Jump to: navigation, search

Back to DVCS
RC: Hisham Albataineh
[12-02 swing], [12-03 owl], [12-03 day]...DAQ work for DVCS [[1]]

[12-01 swing], [12-02 owl], [12-02 day]

RC: Kalyan Allada
[11-30 swing], [12-01 owl], [12-01 day]
[11-29 swing], [11-30 owl], [11-30 day] ← pass change (3 -> 5) kin 3-high (LH2)
[11-28 swing], [11-29 owl], [11-29 day]
[11-27 swing], [11-28 owl], [11-28 day]
11-26 swing, [11-27 owl], [11-27 day]
11-25 swing, 11-26 owl, [11-26 day]
11-24 swing, [11-25 owl], 11-25 day
[11-23 swing], [11-24 owl], [11-24 day] ← BCM calibration
[11-22 swing], [11-23 owl], [11-23 day] ← Start kinematic I-low (LH2)
[11-21 swing], [11-22 owl], [11-22 day ← pass change ( 4pass -> 3pass)
[11-20 swing], [11-21 owl], [11-21 day]
[11-19 swing], [11-20 owl], [11-20 day]
[11-18 swing], [11-19 owl], [11-19 day]
[11-17 swing], [11-18 owl], [11-18 day] (11/17 swing elastic settings, HRS_p = 2.131GeV/c, HRS_angle=37.858deg; 11/18 day HRS= negative polarity (prod)

RC: Jixie Zhang
[11-16 swing], [11-17 owl], [11-17 day] ← change HRS polarity
[11-15 swing], [11-16 owl], [11-16 day]
[11-14 swing], [11-15 owl], [11-15 day]
[11-13 swing], [11-14 owl], [11-14 day]
[11-12 swing], [11-13 owl], [11-13 day] ← Jump in downstream bcm gain [halog]
[11-11 swing], [11-12 owl], [11-12 day]
[11-10 swing], [11-11 owl], [11-11 day] ← VWien=90 deg, HWien=-61 deg, Spin Soleinoid =90 [2] ,← jump in deadtime
[11-9 swing], [11-10 owl], [11-10 day]
[11-08 swing], [11-09 owl], [11-09 day]
[11-07 swing], [11-08 owl], [11-08 day]
[11-06 swing], [11-07 owl], [11-07 day]

RC: Aidan Kelleher
[11-05 swing], [11-06 owl], [11-06 day] ← BCM calibration
[11-04 swing], [11-05 owl], [11-05 day] ← Start kinematic II-low (LH2 and LD2) ← End helicity problem [halog]
[11-3 swing], [11-4 owl], no day summary
[11-2 swing], [11-3 owl], [11-3 day]
[11-1 swing], [11-2 owl], [11-2 day]
[swing 10-31], [owl 11-1], [day 11-1] ← Wien angle at 5 deg [here]
[swing 10-30], [owl 10-31], [day 10-31] ← starting to run in buffered mode [here]
[swing 10-29], [owl 10-30], [day 10-30]
[swing 10-28], [owl 10-29], [day 10-29] ← R. Michaels fixes the end of run reporting [here]
[swing 10-27], [owl 10-28], no day 10-28 shift summary (beam studies) ← Start helicity problems [halog]

RC: Dave Gaskell
[Run plan for Tuesday Swing 10-26 --> Wednesday Day 10-27][10-26 swing], [10-27 owl], [10-27 day] ← Moeller measurements [here]
[Run plan for Monday Day and Swing 10-25]: [10-25 swing], [10-26 owl], [10-26 day] ← Reverse LHRS polarity to negative
[Run plan for Sunday 10-24 swing to Monday 10-25]: [10-24 swing], [10-25 owl], [10-25 day] ← Reverse LHRS polarity to positive
[10-23 swing], [10-24 owl], [10-24 day]
[Run plan for October 22 and October 23]: [10-22 swing], [10-23 owl], [10-23 day] ← Beam energy 5 to 4 passes, Start kinematic III-low
[Run plan for October 21 and October 22]: [10-21 swing] [10-22 owl], [10-22 day]
[Run plan for October 20 and October 21]: [10-20 swing], [owl 10-21], [day 10-21]
[Run plan for Tuesday 19 swing and Wednesday 20 owl ]: [10-19 swing], [10-20 owl], [10-20 day]
[Run plan for Monday 18 swing to Tuesday 19 day]:[10-18 swing], [10-19 owl],[10-19 day]
[Run plan for Sunday 17 swing and Monday 18 owl ]: [10-17 swing]
[10-16 swing], [10-17 owl], [10-17 day]

RC: Brad Sawatzky
[Run Plan for Friday 15 DAY -> Saturday 16 DAY]: [10-15 swing], [10-16 owl], [10-16 day]
[Run Plan for Thurs 14 DAY -> Friday 15 DAY]: [10-14 swing ],[10-15 owl],[10-15 day] ← energy measurement at 5 passes [here]
[Run Plan for Wed 13 SWING -> Thurs 14 DAY]: [10-13 swing],[10-14 owl], no 10-14 day shift summary ← BCM calibration
[Run Plan for Tues 12 SWING -> Wed 13 DAY]: [10-12 swing][10-13 owl] [10-13 day]

RC: Seamus Riordan

[Run Plan for Swing 10/10 through Day 10/11]
[Run Plan for Swing 10/7 through Day 10/8, plans into next week]
[Run Plan for Swing 10/6 through Day 10/7]
[Run Plan for Swing 10/5 through Day 10/6]
[Run Plan for Swing 10/4 through Day 10/5]
[Run Plan for Swing 10/3 through Day 10/4] ← Moeller measurements
[Run Plan for Swing 10/2 - Day 10/3]

Start up run plan: plans for the very beginning of the data taking, data that can be taken without LHRS and cryo target.


Friday Oct 1 Swing and Oct 2 Owl

  1. Check beam on target (experts will do this)
  2. Lumi tests (Kalyan will do this: page number 357-1057)
  3. Compton rates with laser and beam scan (Eric will lead this study in the backroom)
  4. While Compton study takes place, take HRS cosmics data (CODA configuration: LeftHRS). Replay the data and page expert if something looks wrong
  5. BPM calibration
  6. Raster calibration
  7. Go to empty target (you should already be there!), and call MCC to let them know we don't want beam anymore (they will run some tests of their own then). You're free to go...

In case of problems, page Carlos (584-0049) or call Run Coordinator.