Wednesday, October 19, 2016 2:00pm EST

From Hall A Wiki
Jump to: navigation, search

Last meeting: Wednesday, September 28, 2016 2:00pm EST


Agenda



  • MAG Meeting talks
    • KK overview
    • Juliette (4 segment torus studies)
    • Rakitha (collimator power studies)
    • Jim (vacuum vessel?)
    • Ernie (new layout?)
    • Jason (collimators)
  • specify which parts of magnet system we want JLAB to cover
    • cartoon
    • table
    • costing
  • pre-CDR
    • pp. 24-42 (pdf 39-57)
    • lots of "historical" text sitting around
    • Current organization
      • overview
        • kinematical considerations
      • Conceptual Design
        • Constraints
        • Properties
        • Studies of Optical Properties
      • Collimation System
        • Acceptance
        • Beam intercepting
        • Photon blocking
        • Radiation shielding
        • Photons at Detector
        • Engineering considerations
      • Engineering
        • Preliminary
        • Manufacturing plans
        • Hybrid Toroid Services
          • Cooling system
          • DC Power supply
          • Support Frame
          • Vacuum Enclosure
          • Site requirements
        • Specifications (position sensitivity)
  • shielding
  • next meeting time




Minutes

Attending: Juliette, KK, Tyler, Jim, Jason, Chris, Ernie, Seamus

  • MAG meeting - send them out by end of day Thursday
    • Chris working on leads for bids
    • what do we tell people on Monday
    • concentrate on hybrid toroid
    • power deposited on coils (Rakitha)
    • Dieter is a collimator expert
  • specify which parts of magnet system we want JLAB to cover
    • shielding part of JLAB
    • controls
      • power supplies
      • LCW monitoring
      • collimators controls
      • vacuum pumps and controls
    • part of our WBS; we'll specify, JLAB design
  • pre-CDR
    • properties
    • Fig 24, 25 should be there. not 23
    • eliminate 2.3.4
  • shielding
    • $4 million for shielding - poly around hybrid coil
    • need local shielding around the can
  • next meeting time Nov. 2nd (week before the collaboration meeting)




Return to Teleconferences
Return to MOLLER at 11 GeV E09-005