Jefferson Lab HALL A Logbook for September 08 - All EXCEPT Automatic Entries
Main INDEX
Tuesday
243468 09/30/08 23:00 adev BigBite WireChamber Measured Voltage change!
243464 09/30/08 22:49 adev BigBite WireChamber Measured Voltage change!
243460 09/30/08 22:29 adev BigBite WireChamber Threshold change!
243440 09/30/08 15:02 adev BigBite WireChamber Threshold change!
243437 09/30/08 14:21 Kalyan HV set for run 1632
Monday
243426 09/29/08 14:30 Moffit F1 tdc change..
243421 09/29/08 10:31 Yi Qiang Water NMR Calibration
Sunday
243419 09/28/08 17:13 adev BigBite WireChamber HVGUI Start!
Friday
243417 09/26/08 16:18 Jin Huang Target: Verticle Coil Polarity Inversed
243416 09/26/08 11:27 adev BigBite WireChamber Measured Voltage change!
243415 09/26/08 09:28 R. Michaels Right HRS scalers dropped
243414 09/26/08 09:08 V. Sulkosky Rebooted IOCHA5 for BCM
Thursday
243413 09/25/08 23:43 Yi Qiang First Water Signal in Hall !
243410 09/25/08 15:37 adev BigBite WireChamber HVGUI Start!
243409 09/25/08 15:16 Kalyan BigBite DAQ is up and running again
243407 09/25/08 15:08 kalyan Compressed air lines connected for BigBite PMTs
Wednesday
243405 09/24/08 12:33 Kalyan CPU borads for upgrade to Vxworks 5.5
243404 09/24/08 09:47 K DAQ down
Tuesday
243401 09/23/08 16:57 adev BigBite WireChamber Threshold change!
243394 09/23/08 16:19 V. Sulkosky Ped Suppression Removed for Helicity and Target Spin
243393 09/23/08 16:15 adev BigBite WireChamber Threshold change!
243392 09/23/08 15:54 adev BigBite WireChamber Threshold change!
243391 09/23/08 15:13 adev BigBite WireChamber HVGUI Start!
Monday
243387 09/22/08 18:13 adev BigBite WireChamber HVGUI Start!
243386 09/22/08 17:55 Kalyan Cosmic trigger for BB lead-glass blocks
Sunday
243380 09/21/08 16:17 Kalyan bbts1 crate in the readout as ROC12
Saturday
243377 09/20/08 21:19 Jack VDC gas flowing
Friday
243366 09/19/08 17:25 Jin Huang RICH lib added to replay softwares
243355 09/19/08 10:54 R. Michaels R-HRS DAQ ready, runs 2.6
Thursday
243348 09/18/08 16:19 xqian Noise Cross-talk on BigBite Wire Chamber
243341 09/18/08 15:38 Jack Left Arm Detector Stack is out
243334 09/18/08 14:37 Moffit Left Arm TIR/TS cable disconnected
243326 09/18/08 11:45 R. Michaels Modified ts_scaler.crl (LHRS)
243324 09/18/08 11:19 Jack Dry air to the hall
Wednesday
243315 09/17/08 21:20 V. Sulkosky Target Spin Signal Added to TIR
243314 09/17/08 21:14 V. Sulkosky Helicity and Target Spin Signal in ADC
243295 09/17/08 14:13 R. Michaels scaler swap on L-HRS
Tuesday
243285 09/16/08 23:41 adev BigBite WireChamber Measured Voltage change!
243284 09/16/08 23:31 adev BigBite WireChamber Measured Voltage change!
243282 09/16/08 22:28 V. Sulkosky Re: Scaler gates and target signals in L-HRS
0 09/16/08 18:00 no_name no_key
243263 09/16/08 14:08 Jin Huang Target: Spin Signal to IOC changed to TTL level
243258 09/16/08 12:15 adev BigBite WireChamber Measured Voltage change!
243255 09/16/08 12:03 adev BigBite WireChamber Measured Voltage change!
243245 09/16/08 11:11 adev BigBite WireChamber Measured Voltage change!
Monday
243242 09/15/08 23:10 adev BigBite WireChamber Measured Voltage change!
243232 09/15/08 21:47 adev BigBite WireChamber Measured Voltage change!
243211 09/15/08 18:46 Kalyan Scaler gates and target signals in L-HRS
243210 09/15/08 18:45 Kalyan Scaler gates and target signals in L-HRS
243203 09/15/08 17:11 Jin Huang hareboot12 set up for In Hall Target electronics
243200 09/15/08 15:56 brads Outside web access blocked for computers on Hall A subnets
243199 09/15/08 15:44 Jin Huang Proxy Setting to Access hareboot*
243191 09/15/08 10:16 adev BigBite WireChamber HVGUI Start!
243190 09/15/08 09:31 ycwang A1 information of cosmic test
243188 09/15/08 09:15 adev BigBite WireChamber Measured Voltage change!
243186 09/15/08 09:05 adev BigBite WireChamber Measured Voltage change!
Sunday
243185 09/14/08 23:53 adev BigBite WireChamber Measured Voltage change!
243184 09/14/08 23:43 adev BigBite WireChamber Threshold change!
243183 09/14/08 23:32 adev BigBite WireChamber Measured Voltage change!
243182 09/14/08 18:57 V. Sulkosky Turned on LHRS VDC Discriminator Thresholds
243172 09/14/08 16:58 adev BigBite WireChamber Threshold change!
243159 09/14/08 13:51 adev BigBite WireChamber Threshold change!
243158 09/14/08 13:41 adev BigBite WireChamber Threshold change!
Saturday
Friday
243145 09/12/08 22:38 adev BigBite WireChamber Threshold change!
243142 09/12/08 19:05 V. Sulkosky Re: S2m ADC Signals from Paddle 4 Resolved
243141 09/12/08 18:45 V. Sulkosky ADC in ROC 4 Slot 20 Removed
Thursday
243073 09/11/08 16:06 adev BigBite WireChamber Threshold change!
243072 09/11/08 15:51 Jin Huang Target: Spin Signal Recovered
243069 09/11/08 14:54 Jin Huang Target: Spin Signal to Bigbite to be down for 1 hour
243065 09/11/08 14:22 R. Michaels adaql2 rebuilt, CODA running
243063 09/11/08 14:12 adev BigBite WireChamber Threshold change!
Wednesday
243062 09/10/08 18:22 adev BigBite WireChamber Measured Voltage change!
243061 09/10/08 18:11 adev BigBite WireChamber Measured Voltage change!
243060 09/10/08 18:11 V. Sulkosky A1 Aerogel Discriminator Threshold Changed (30 mV)
243059 09/10/08 18:05 V. Sulkosky Re: L-HRS DAQ problems fixed
243058 09/10/08 17:42 V. Sulkosky S2m ADC Signals from Paddle 4 Resolved(?)
243057 09/10/08 14:46 atrig Trigger-Download
243054 09/10/08 01:03 adev BigBite WireChamber Threshold change!
Tuesday
Monday
242988 09/08/08 23:00 Jin Huang Replay Dir Built for Transversity
242987 09/08/08 20:41 adev BigBite WireChamber Threshold change!
242982 09/08/08 20:20 adev BigBite WireChamber Threshold change!
242976 09/08/08 20:10 adev BigBite WireChamber Threshold change!
242974 09/08/08 19:59 adev BigBite WireChamber Measured Voltage change!
242944 09/08/08 13:25 adev BigBite WireChamber HVGUI Start!
242943 09/08/08 11:13 V. Sulkosky Replaced 1877 TDC in ROC 3, Slot 16
242940 09/08/08 09:29 Jack Check valve on right argon cylinder cracked
Sunday
242886 09/07/08 00:06 adev BigBite WireChamber Measured Voltage change!
Saturday
242883 09/06/08 23:56 adev BigBite WireChamber Measured Voltage change!
Friday
242877 09/05/08 14:47 Jin Huang Target: Spin Signal Recovered
242876 09/05/08 14:23 Jin Huang Target: Spin Signal Temporarily Out
242875 09/05/08 14:00 adev BigBite WireChamber Measured Voltage change!
242874 09/05/08 13:50 adev BigBite WireChamber Measured Voltage change!
242871 09/05/08 11:09 R. Michaels L-HRS DAQ problems fixed, some issues remain
Thursday
242866 09/04/08 17:22 Kalyan Scaler gates ready
Wednesday
242842 09/03/08 19:12 adev BigBite WireChamber HVGUI Start!
242836 09/03/08 17:10 Chiranjib HV back to the original values
242834 09/03/08 17:07 Chiranjib NO ADC histograms
242829 09/03/08 16:44 Chiranjib HV change
242826 09/03/08 16:26 Jin Huang Target: Simulated Spin Signal to 30s/flip
242822 09/03/08 12:08 R. Michaels L-HRS scalers ready (but waiting for target state)
Tuesday
242818 09/02/08 23:47 Jin Huang Target: Spin Signal is Back
242797 09/02/08 17:17 Moffit BBDAQ: ROC5 changes. Removed software limit on pulser prescale.
242792 09/02/08 15:31 fansler Q2/Q3 LN2 readbacks
Monday