August 27th 2021

From Hall A Wiki
Jump to: navigation, search
  • Updates
    • HCal
      • All ADC and TDC working, all signals seems ok
      • adding new FADC for reference channel and supercluster
      • F1 TDC with reference time, still need to check to get it to work - hope to finish today
      • will take cosmics
      • pulser setup for coincidence trigger check next
    • Bigbite Shower
      • finished mapping checks : turning one column at a time, found a couple cables swapped, fixed, done
      • pulser test : pulser at detector end and look in FADC, compared amplitude of FADC with scope to evaluate attenuation
      • issue with summing module
      • one FADC not working
      • one fan in /out module not working
      • debugging
      • estimate few days to finish debugging
      • after look at calibration code
      • fan/in out module : F428 - two main locations : cabinet outside SBS bunker detector 1 or 2 and 1 cabinet in LHRS - might need
      • starting discussion of coincidence trigger with Bob and Scott
      • cosmics run take - but still need to check plots
    • Bigbite Hodoscope
      • TDC extension installed, TDC look good for every channel
      • ADC cables look goof
      • new LV for NINO received ( goes up to 20 V ) NINO working
      • HV working with telnet, Steve fixed EPICS issue
      • will set HV as before
      • Mark setup trigger for cosmics
      • can take data
      • SBS offline updated software will be installed
      • working on How-to for shift takers
      • still hoping to get compress air for housing of PMT to avoid He poisoning
      • Mark setup hodoscope trigger
    • GRINCH
      • all channels connected and look ok with HV
      • debugging a few empty TDC channels
      • ADC repaired one ADC cable : all ADC cable should work
      • run CODA
      • just need to set trigger and gate for cosmics
      • two NINO cards need to be replaced ( at top of GRINCH ) need fall protection set up, might need to use lift
      • found connection for LED and pulser working
      • CODA working
      • old gate should still be set up
    • LHRS
      • Fiber to TI connected, need to get new firmware for the TI received this morning.
      • will need updated TI library and can give it a try
      • running cables from LHRS, BCM to SBS bunker, will add a new cable tray, see HALOG
      • new router installed, HRS DAQ working fine after
      • can use with one VXS crate with current firmware / library
    • CDet
      • reviewed all pixels on half module, will revised resistors of some of them
      • new data with new resistors take and will be analyzed
    • GEM BigBite
      • all electronics connected working
      • INFN has noise issue being investigated
      • HV on one module
      • UVA side everything connected and looks file : took data for 2 days, can see signals but full analysis still on-going
      • all cosmics data taken with VTP : 20 M events
      • took overnight data without zero supress, last night was taken zero supression
      • could 5.2 KHz with zero supression as long as we don't reach 900 MB/s
    • RF time
    • need add TDC
    • HV
      • Issue with CAEN HV for Hodoscope with EPICS
    • Scalers
      • need cabling
      • need work on readout
      • need one SIS set to 3801 for helicity, rest 3800
      • G0 scalers than can be used for detectors - need width at least 10 ns as input
      • FADC for BPM/raster + helicity signal
      • can add readout list
      • 3820 cannot get it to work so far, will take it out - and work on it in TEDF
    • Recoil polarimeter
    • EPICS
    • BCM
      • plugged signal in analog receiver for upstream - 30 uA - will check signal in counting house
      • DAC input for VtoF
      • digital receiver - cable should still be connected as before
    • Helicity
      • erverything plugged in LHRS - still need L1A patch to scaler
      • code merged to readout list - can test it
      • last piece of helicity scaler from TEDF to be ported over to LHRS
      • finishing podd module for readout
    • start / stop / EPICS script
      • working on tedbbdaq for test setup
      • will update scripts on adaq


  • On-going tasks
    • Network setup ( done ) - SBS MPD side might need few cables - need pull network for SBS side (0%) - should check when bunker is setup
    • Scaler crate setup (90 % - Steve - need add readout) - Steve could not talk to CPU (done) - IP fixed with DHCP - need change fan tray - CAEN ( done )
    • documentation of VME crate names to power cycle - need to make sure all VXS are in dhcp -Bryan ( done ) https://hallaweb.jlab.org/wiki/index.php/SBS_Network_Devices_in_Hall_A
    • 3 rd GEM VXS crate install router moved up ( 100% )
    • need power and network in GEM bunker ( done )
    • boot VME controllers (100 % done - need ask hostname TS crate )
    • TS cables - all fibers plugged (done) - will post informations -hodoscope / grinch/ shower separate - can be combined at any time now everything plugged to TS

- new firmware for LHRS TI -

    • detector cabling ( 100 % - debugging )
    • new MPD production - about to start - FPGA received by Paolo - need check when production starts
    • MPD VTP readout - on-going in daq lab - still having issue getting APV sending data to MPD - events going through high speed link
    • MPD being setup in Hall A - need setup VTPs to boot (done ) - 10 gigE network plugged (done) - will be able to test in Hall A (done) - 5.2 KHz max trigger rate - 900 MB/s max per VTP - LV installed soon (done )
    • setup portservers : 1 4 port portserver for VTP (done), still need to set up a 8 port one and HCAL portserver - need one more
    • need to install remote switch for crate in bunker (done hareboot32) - rest are VXS or VME64 - need put CAEN crate on network
    • Bigbite - HCal trigger setup - need check with Bob if additionnal NIM crate need to be install - might be ok with current NIM crate
    • TS setup - 90 % - all cabled - still need to configs
    • Beamline crate setup ( in scaler crate ) - FADC is in scaler need to be setup - need pull raster BPM BCM (0% will do it with David and Bob, Jack Heidi helping )
    • HCAL cabling ( done )
    • HCAL need power ( done, Berta )
    • Mark hodoscope trigger ( done )
    • Computer move to Hall A : sbsdaq1/2/3 tedbbdaq (done ) enpcamsonne ( done ) - need to install X server - Need ask Ole -
    • LHRS fiber pull ( waiting fiber August 13th ) - most likely LHRS at end of SBS run (done )
    • Cosmics trigger ( done ) -
    • Cosmics HCAL ( ongoing )
    • Cosmics Shower ( on going )
    • Cosmics Hodoscope ( on-going )
    • Cosmics Grinch
    • Test 10 gig link to DAQ to adaq1 - 900 MB/s - will try with two VTP
    • New computers have been installed - Main DAQ computer still not received -
    • EPICS script -
    • alarm handler (David) - still need to set up on adaqsc - check with Ole to have hacweb7 online and copy - need to make sure audio avalable for alarm
  • Outstanding issues
    • 2 bad FADCs Bigbite - 1 FADC was repaired - one being repaired - 1 Compton FADC - repaired can use as spare ( done )
1 more bad FADC on shower ( 1 channel bad ) 
    • SD delay : still need 2 SDs ( Glasgow and INFN just requested quote ) Hall B lending two - will get once checked
    • need to adjust for HCAL transit time with different PMTs - looked at it already, about 12 ns - 20 cable after summing - still need to look with led
    • status of cosmics paddles ( installed by Bogdan ) - HCAL paddles in test lab still need to be set up - Scott checked with techs - will push next week
    • GEM fibers too short : Mark will order parts - ( fiber ordered - + 2 extensions ordered )
    • 15 bad MPDs - need to look at fixing - Ben ? Dustin loaning us 6 MPDs - need 85 total - 67 in hand - 1 MPD (301) VME address issue in some slot -
      • APV needed 1208 - 966 in hand working - Michael might lend 40 - ( check with Thir )
    • GEM fiber possibly bad - 2 broken - if long sleeve want to pull spare in separate conduit ( extension setup - 50 % )
    • GEM HV IP need setup ( Alex ) Done
    • GEM clock/trigger box for BB side ( got one from UVA )
    • GEM LV remote control ( done )
    • GEM VTP transceivers hanging - ( swapped with SSP - firmware fix will be implemented )
    • SBS bunker cables
      • fiber order
      • test multiple event builder soon


  • Status software in a-onl@aonl1
  • GRINCH
    • still need to install - need to check if commits were merged
  • Shower
    • installed
  • GEM
    • Andrew still need to set it up there
  • Hodoscope
    • installed
  • HCAL
    • setup and can look at data


  • All crates
    • want run GEM and shower
    • readout list ready - just need CODA configs
    • TS for V792 gate
  • coincidence Shower and hodoscope in TS2 of GEM