Thursday, December 7, 2017 4PM ET
From Hall A Wiki
Previous meeting: Thursday, November 2, 2017 4PM ET
Media:KK's MOLLER Task List.pdf
Tasks for Simulation Subsystem to track:
- 1) LA Tech and SBU -- Simulation/Shielding and Activation : Optimizing the shielding design and develop first order practical design that can be passed to engineers, Radiation load on target clam-shell (o-ring) and magnet coils, Activation studies for various components.
- 2) Wouter -- Pion Simulation (Muon Pair Production): could be significant for pion detector
- 3) TBD -- Detectors/Simulation (Slit scattering bkgd): Comprehensive note summarizing the elimination of all 1-bounce and leading 2-bounce sources
- 4) Seamus and Yury -- General/Simulation (Radiative corrections for all physics processes): Incorporate radiative corrections for e-e and inelastic e-p scattering
- 5) Pion and Simulation Group -- Simulation/Pion (Hyperon background estimation): Strategy to evaluate the hyperon bkgd using full suite of detectors
- 6) David and Seamus -- Simulation/Tracking (Optics collimator for Q2): simulated Q2 analysis and the use of tracking GEMs and special collimation
Media:MOLLER-IntDet-DirRev-Tasks.pdf
Tasks which overlap with Integrating Detector Subsystem:
- 7) Pion Group -- Pion Simulation (Beamdump bkgd impact): beamdump bkgds may affect some detectors
- 8) Manitoba and SBU -- Detectors/Simulation (PMT backgrounds): Comprehensive estimate of all bkgds at the main detector PMTs
- 9) UVA Group -- Detector/Simulation (Main detector geometries): Optimize radial and azimuthal ring dimensions to optimize background asymmetry correction determination and systematic (Yuxiang's approach)
- 10) UVA Group -- Simulation (PMT double difference): From Qweak experience, evaluate upper limit to possible systematic from A_T in showerMax and thin quartz
- 11) SBU Group Detectors/Simulation (ShowerMax splashback): Estimate possible bkgds in main detector PMTs from shmx splashback
- 12) SBU Group -- Detectors/Simulation (Detector shielding optimization): Figure out the configuration of heavy- and light-Z shielding (First need shielding Geometry)
- 13) SBU Group -- Detectors/Simulation (Crosstalk evaluation): Evaluate impact on specific detector measurements of bkgd from other sources
Agenda
- Director's Review task tracking updates
- Task List name assignments (first pass): Dustin MOLLER_TasksList_simulation_mcnulty.pdf pdf
- Task List name assignments (first pass): Rakitha MOLLER Tasks Sublist
put your slides or links to elogs here:
- Background: Ciprian slides
Attendance:
Rakitha, Seamus, Cameron, Sakib, Kurtis, Wouter, Dustin,
Minutes
Agreed to add dependencies and ranks to each task. For now, we will create subtask lists by the different primary contact person. Then later we can merge all the tasks into a single task list. Dustin and Rakitha went over all the simulation tasks and assigned a primary contact person.
Return to Teleconferences
Return to MOLLER at 11 GeV E09-005