Difference between revisions of "G2p safety 102411"

From Hall A Wiki
Jump to: navigation, search
(October 24, 2011 Saftey Readiness Review)
(October 24, 2011 Saftey Readiness Review)
 
(One intermediate revision by the same user not shown)
Line 17: Line 17:
 
|-
 
|-
 
   |  Beamline Commissioning
 
   |  Beamline Commissioning
   | M. Tiefenbach
+
   | Y. Roblin
 
|-
 
|-
 
   |  Engineering, Design & Field Mapping
 
   |  Engineering, Design & Field Mapping
 
   | R. Wines
 
   | R. Wines
 
|-
 
|-
   | [http://hallaweb.jlab.org/experiment/g2p/meetings/safety_102411/Folts.pptx Hall A Installation, Mechanical Structures]
+
   | Hall A Installation, Mechanical Structures ([http://hallaweb.jlab.org/experiment/g2p/meetings/safety_102411/Folts.pptx talk] [http://hallaweb.jlab.org/experiment/g2p/meetings/safety_102411/G2P_installation_working_update_2_post_target_repair.pdf timeline])
 
   | E. Folts
 
   | E. Folts
 
|-
 
|-

Latest revision as of 16:00, 4 January 2012

October 24, 2011 Saftey Readiness Review

JLab F113, 1:00-5:00 pm

Topic Presenter
Welcome and Introduction J. P. Chen
Polarized Target C. Keith
Hall A Beamline T. Michalski
Beamline Commissioning Y. Roblin
Engineering, Design & Field Mapping R. Wines
Hall A Installation, Mechanical Structures (talk timeline) E. Folts
Radiation Control P. Degtiarenko
Radiation Control G. Kharashvili
Experiment Preparation K. Slifer

Charge

The official charge. The committee has also asked us to address these specific questions.

Note to Presenters: Please send your presentation and supporting documents to slifer@jlab.org (or alternatively post them on the CUE at /u/group/halla/www/hallaweb/html/experiment/g2p/meetings/safety_102411 ). All material will then be viewable here

Documentation

The experimental documentation is posted here.