Difference between revisions of "G2p shifts"
From Hall A Wiki
(→Information for Shift Workers) |
(→Information for Shift Workers) |
||
Line 5: | Line 5: | ||
*The g2p [https://hallaweb.jlab.org/wiki/index.php/G2pAnalysis Analysis Guide] | *The g2p [https://hallaweb.jlab.org/wiki/index.php/G2pAnalysis Analysis Guide] | ||
*Setting the [http://hallaweb.jlab.org/halog/log/html/1203_archive/120302155944.1.pdf Spectrometer and Septa] Magnets | *Setting the [http://hallaweb.jlab.org/halog/log/html/1203_archive/120302155944.1.pdf Spectrometer and Septa] Magnets | ||
− | *Conversion between Septa Current and Momentum [http://hallaweb.jlab.org/halog/log/html/1203_archive/120301185815.html P_to_I] [http://hallaweb.jlab.org/halog/log/html/1203_archive/120303134343.html I_to_P] | + | *Conversion between Septa Current and Momentum ([http://hallaweb.jlab.org/halog/log/html/1203_archive/120301185815.html P_to_I]) and ([http://hallaweb.jlab.org/halog/log/html/1203_archive/120303134343.html I_to_P]) |
*[http://hallaweb.jlab.org/halog/log/html/1203_archive/120302132459.html Quadrupole Cycling] for g2p | *[http://hallaweb.jlab.org/halog/log/html/1203_archive/120302132459.html Quadrupole Cycling] for g2p | ||
*Run Sheets ([http://hallaweb.jlab.org/experiment/g2p/shifts/Run-Sheet_g2p_L.pdf LHRS] [http://hallaweb.jlab.org/experiment/g2p/shifts/Run-Sheet_g2p_R.pdf RHRS]) | *Run Sheets ([http://hallaweb.jlab.org/experiment/g2p/shifts/Run-Sheet_g2p_L.pdf LHRS] [http://hallaweb.jlab.org/experiment/g2p/shifts/Run-Sheet_g2p_R.pdf RHRS]) |
Revision as of 17:05, 3 March 2012
Information for Shift Workers
- Runplan and Schedule
- Online Replay Guide
- The g2p DAQ
- The g2p Analysis Guide
- Setting the Spectrometer and Septa Magnets
- Conversion between Septa Current and Momentum (P_to_I) and (I_to_P)
- Quadrupole Cycling for g2p
- Run Sheets (LHRS RHRS)
- Shift Checklist (pdf)
- Slow Raster Procedure
- Hall A Dump Camera Light
Useful Links
- Beamline Component locations
- Contact list of phone numbers
- MCC Whiteboard +offsite access to logs (courtesy Brad)
- Hall A logbook
- g2p wiki
- d2n HowTo (Please note some info is out of date).
- Spring11 HowTo (Please note some info is out of date).
- Online Replay Guide (detailed) (Old Transversity Guide) (Please note some info is out of date).
- An example of an excellent Shift Leader Summary for reference.
Notes
- Ask for beam off when modifying Septa Current or inserting/removing target.
- Change Septa in less than 50 A increments. Keep left and right matched when beam is on.
- Coda configuration: LHRSHAP, RHRSBUFF
- On the g2pBCM strip chart, use the IBC1H04CRCUR2 (red) to monitor the beam current.