Difference between revisions of "G2p shifts"

From Hall A Wiki
Jump to: navigation, search
(Notes)
(Notes)
Line 30: Line 30:
 
*Log VDC efficiencies at least once per shift.
 
*Log VDC efficiencies at least once per shift.
 
*Hall A current : Open Monticello / Wall / Hall A GUI, and look at the 1H00 BCM.
 
*Hall A current : Open Monticello / Wall / Hall A GUI, and look at the 1H00 BCM.
 +
*For Hall A tools screen, on hacuser type "NewTools" which pops up EOSMenu.  Select "HLAmain".
 +
*For Stripchart, click toolbox on bottom of desktop menu
 +
*Keep a stripchart running of the septa currents.
 +
*Note: There is *always* one transitor fault on the right septa (bigbite powersupply).

Revision as of 11:00, 12 March 2012

Information for Shift Workers

Useful Links

Notes

  • Ask for beam off when modifying Septa Current or inserting/removing target.
  • Change Septa in less than 50 A increments. Keep left and right matched when beam is on.
  • Coda configuration: LHRSHAP, RHRSBUFF
  • Log VDC efficiencies at least once per shift.
  • Hall A current : Open Monticello / Wall / Hall A GUI, and look at the 1H00 BCM.
  • For Hall A tools screen, on hacuser type "NewTools" which pops up EOSMenu. Select "HLAmain".
  • For Stripchart, click toolbox on bottom of desktop menu
  • Keep a stripchart running of the septa currents.
  • Note: There is *always* one transitor fault on the right septa (bigbite powersupply).