Difference between revisions of "GMp"
From Hall A Wiki
(→Spring 2016 Run plan) |
(→Spring 2016 Run plan) |
||
Line 14: | Line 14: | ||
== Spring 2016 Run plan == | == Spring 2016 Run plan == | ||
− | * [http://hallaweb.jlab.org/12GeV/experiment/E12-07-108/ Boiling Study] | + | * [http://hallaweb.jlab.org/12GeV/experiment/E12-07-108/Documents/boiling_plan_2016.pdf Boiling Study] |
* [[Production Run Plan R-HRS]] | * [[Production Run Plan R-HRS]] | ||
* [[Production Run Plan GMp Dedicated Time L-HRS and R-HRS]] | * [[Production Run Plan GMp Dedicated Time L-HRS and R-HRS]] |
Revision as of 18:40, 20 April 2016
Contents
Overview
Shift Crew Information
Expert Shift Schedule
- Spring 2016 Expert Schedule
- Fall 2014: Expert Schedule
Spring 2016 Run plan
- Boiling Study
- Production Run Plan R-HRS
- Production Run Plan GMp Dedicated Time L-HRS and R-HRS
- Commissioning Run Plan 2016
- Optics Run Plan Spring 2016 (First Pass) 48.8 degrees
- Run summary for commissioning in spring 2016
Spring 2015 Run plan
- Optics Run Plan Spring 2015 (Second Pass) 48 degrees
- Optics Run Plan Spring 2015 (Second Pass) 52.5 degrees
- Optics Run Plan Spring 2015 (First Pass)
- Optics Run Plan Spring 2015 (Second Pass)