Difference between revisions of "HappexIII Work List"
From Hall A Wiki
(8 intermediate revisions by 2 users not shown) | |||
Line 1: | Line 1: | ||
− | {|border="1" style="text-align:left" | + | {|class="wikitable" border="1" cellpadding="5" cellspacing="0" style="text-align:left" |
|+ HAPPEx III Work List | |+ HAPPEx III Work List | ||
! What !! Postdoc !! Description | ! What !! Postdoc !! Description | ||
Line 6: | Line 6: | ||
| Dustin | | Dustin | ||
| | | | ||
− | * AutoDB configuration | + | * AutoDB configuration |
+ | * Recover GreenMonster | ||
* Make list of epics words for DAQ () | * Make list of epics words for DAQ () | ||
* Sync monitor between crates (Luis) | * Sync monitor between crates (Luis) | ||
* Pedestal noise | * Pedestal noise | ||
* Pickup tests | * Pickup tests | ||
− | * BMW scripts | + | * BMW scripts (Kent) |
* Hall C BCM signal | * Hall C BCM signal | ||
+ | * New PITA QASY (high-speed) feedback script | ||
+ | * Test new helicity board | ||
+ | * New config file mechanism (Bob?) | ||
+ | * Test injector crate | ||
+ | * Implement/test LHRS crate (Bob) | ||
+ | * High-rate DAQ system tests | ||
+ | * ET system test at 240 Hz | ||
|- | |- | ||
! Analysis chain | ! Analysis chain | ||
| Mark | | Mark | ||
| | | | ||
− | + | {| border="1" cellpadding="5" cellspacing="0" style="text-align:left" | |
− | + | |- | |
− | + | | Kent/Rupesh || Decode Qweak ROC structure in PAN || Done | |
− | + | |- | |
− | + | | Mark || Run analysis on HAPPEx II data (Mark) | |
− | + | |- | |
− | + | | Rupesh || QWeak ADC -> PAN || Done | |
− | + | |- | |
+ | | Rich || | ||
+ | *Multiplet mode in PAN (fall) | ||
+ | *Multiplet mode in POSTPAN, Regression (fall) | ||
+ | *Multiplet mode in dithering (spring) | ||
+ | |- | ||
+ | | || Dithering analysis for PREX system | ||
+ | |- | ||
+ | | Rich || 240 Hz speed/efficiency | ||
+ | |} | ||
|- | |- | ||
! Detector prep | ! Detector prep | ||
Line 34: | Line 51: | ||
** New/Old base | ** New/Old base | ||
** Test for He poisoning (strong baseline current and look for double pulsing) | ** Test for He poisoning (strong baseline current and look for double pulsing) | ||
− | * Calculate light yield from HAPPEx III detector (KK) | + | * Calculate light yield from HAPPEx III detector (KK/Wexler) [DONE] |
* Online LED pulse linearity hardware (Kent) | * Online LED pulse linearity hardware (Kent) | ||
** LED mounting (Rupesh) | ** LED mounting (Rupesh) | ||
Line 48: | Line 65: | ||
** Test pedestals | ** Test pedestals | ||
* Electronics | * Electronics | ||
+ | ** pulse LED linearity testing system | ||
** Relays between counting and integrating mode | ** Relays between counting and integrating mode | ||
+ | * PREX test configuration design/installation (Dustin) | ||
|- | |- | ||
! Moller polarimeter | ! Moller polarimeter | ||
| Dustin | | Dustin | ||
− | | Dustin, Luis and Sasha become experts at running the Moller polarimeter | + | | |
+ | * Dustin, Luis and Sasha become experts at running the Moller polarimeter | ||
+ | * New [http://hallaweb.jlab.org/parity/prex/mollfadc.pdf Custom-FADC DAQ] | ||
+ | ** Spilt signals between old and new DAQs | ||
+ | ** pre-stage FADC DAQ work | ||
+ | ** implement parallel DAQ in Fall '09, possibly main DAQ for PREX (Brad, Eugene, Bob) | ||
|- | |- | ||
! Compton polarimeter | ! Compton polarimeter | ||
| Mark | | Mark | ||
| | | | ||
− | + | {| border="1" cellpadding="5" cellspacing="0" | |
− | * Increase IR cavity power | + | |- |
− | + | | Alex, Bob || | |
− | * | + | Electron detector (Alex, Bob) |
− | + | ** repair edet planes | |
− | + | ** complete tests | |
+ | ** reinstall | ||
+ | |- | ||
+ | | Mark || Increase IR cavity power || Begun testing moving lense 3 to improve mode matching. Significant steering observed -> might take a while to optimise | ||
+ | |- | ||
+ | | Mark || Transfer function | ||
+ | *1/4 wave plate scan | ||
+ | | Quarter wave plate scan performed, analysis underway | ||
+ | |- | ||
+ | | Sirish, Al, Vlad, Abdurahim || Shine green laser through cavity | ||
+ | |- | ||
+ | | Alex, Bob || High-rate helicity flip tests | ||
+ | |- | ||
+ | | Greg, Bob? || integrate electron DAQ and FADC | ||
+ | |- | ||
+ | | Brian Q., Megan || Photon Detector | ||
+ | * install positioning scints (Brian Q.) | ||
+ | * install new tube/base with linearity test (Megan) | ||
+ | * LED studies of PMT linearity (Megan) | ||
+ | |} | ||
|- | |- | ||
! Accelerator dev/liason | ! Accelerator dev/liason | ||
| Mark and Dustin | | Mark and Dustin | ||
| | | | ||
− | + | {|border="1" cellpadding="5" cellspacing="0" style="text-align:left" | |
− | + | |- | |
− | + | | Mark || Run 8 more cables from HAPPEx DAQ to source table || Not necessary, already existed | |
+ | |- | ||
+ | | || coordinate high-rate flip test (ATLIS) | ||
+ | |- | ||
+ | | || coordinate low-current running (ATLIS) | ||
+ | |- | ||
+ | | || coordinate spin dance for polarization optimization (ATLIS?) | ||
+ | |} | ||
|- | |- | ||
! Modulation | ! Modulation | ||
Line 77: | Line 127: | ||
* Test BMW system | * Test BMW system | ||
* Add new magnets to arc | * Add new magnets to arc | ||
− | |||
− | |||
* Revive Hall B,C and compton signals | * Revive Hall B,C and compton signals | ||
+ | * Design PREX modulation system | ||
+ | * Modulation "spec" document (Kent) | ||
|- | |- | ||
! Installation planning | ! Installation planning | ||
Line 86: | Line 136: | ||
* When is the detector going in? | * When is the detector going in? | ||
* What tools are needed? | * What tools are needed? | ||
− | * | + | * Give Ed a [[list of surveys]] that are required |
|- | |- | ||
! Commissioning planning | ! Commissioning planning | ||
Line 93: | Line 143: | ||
|- | |- | ||
! Documentation and administration | ! Documentation and administration | ||
+ | | Mark | ||
+ | | | ||
+ | {| border="1" cellpadding="5" cellspacing="0" | ||
+ | |- | ||
+ | | Dustin || ALIST for watercell removal procedure | ||
+ | |- | ||
+ | | Kent || commissioning plan / schedule | ||
+ | |- | ||
+ | |Kent || COO, RSAD, TSOP must be produced. Shift workers must be asked to read and sign before shift. | ||
+ | |- | ||
+ | | Dustin || Target training must be organised and advertised. Contact Dave Meekins and JP. | ||
+ | |- | ||
+ | | Mark || Shift schedule and signup sheet || Done | ||
+ | |- | ||
+ | | Xiaochao || Run coordinator signup || Done and published | ||
+ | |- | ||
+ | | Mark || WAC signup | ||
+ | |- | ||
+ | | Mark || Online documentation for shift workers | ||
+ | |- | ||
+ | | Mark || Manpower schedule || Email sent, wiki page produced [[parity availability]] still sparse | ||
+ | |- | ||
+ | | Mark || Contact list update || Wiki page created [[parity contact]], email sent out | ||
+ | |- | ||
+ | | || Image Library (what is this?) | ||
+ | |} | ||
+ | |- | ||
+ | ! PREX | ||
| | | | ||
| | | | ||
− | * | + | * Radiation issues for PREX |
− | * | + | ** Possible Shielding? Thermalized neutron estimates to be done with RSAD (Pavel) |
− | * | + | * PREX collimators and Sieve |
− | * | + | ** Finalize the [http://hallaweb.jlab.org/parity/prex/paul_collim.xfig.pdf design] |
− | * | + | ** Manufacture |
− | * | + | * Septum |
− | * | + | ** Manufacturing |
− | * | + | ** Testing in testlab (Fall 2009) |
+ | * Build [http://hallaweb.jlab.org/parity/prex/prex_target.xfig.pdf PREX target ladder] | ||
+ | * GEM detectors | ||
+ | ** Needed for high-rate <math>Q^2</math> during PREX (Nilanga, Kent, KK) | ||
+ | ** Needs design of frontend electronics and DAQ (Nilanga, Kent, KK, Bob) | ||
|- | |- | ||
|} | |} |
Latest revision as of 17:20, 5 August 2009
What | Postdoc | Description | ||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
DAQ | Dustin |
| ||||||||||||||||||||||||||
Analysis chain | Mark |
| ||||||||||||||||||||||||||
Detector prep | Dustin | Cosmics Checkout, PMT linearity tests, LED system, Mounting hardware and angles
| ||||||||||||||||||||||||||
Moller polarimeter | Dustin |
| ||||||||||||||||||||||||||
Compton polarimeter | Mark |
| ||||||||||||||||||||||||||
Accelerator dev/liason | Mark and Dustin |
| ||||||||||||||||||||||||||
Modulation |
| |||||||||||||||||||||||||||
Installation planning |
| |||||||||||||||||||||||||||
Commissioning planning | ||||||||||||||||||||||||||||
Documentation and administration | Mark |
| ||||||||||||||||||||||||||
PREX |
|
LINKS