− | * Decode Qweak ROC structure in PAN (Rupesh/Kent)
| + | {| border="1" cellpadding="5" cellspacing="0" style="text-align:left" |
− | * Run analysis on HAPPEx II data (Mark)
| + | |- |
− | * QWeak ADC -> PAN (Rupesh)
| + | | Kent/Rupesh || Decode Qweak ROC structure in PAN || Done |
− | * Multiplet (Mark to contact Richard)
| + | |- |
− | ** Multiplet mode in PAN (fall,Richard)
| + | | Mark || Run analysis on HAPPEx II data (Mark) |
− | ** Multiplet mode in POSTPAN, Regression (fall)
| + | |- |
− | ** Multiplet mode in dithering (spring)
| + | | Rupesh || QWeak ADC -> PAN || Done |
− | * Dithering analysis for PREX system
| + | |- |
− | * 240 Hz speed/efficiency (Rich)
| + | | Rich || |
| + | *Multiplet mode in PAN (fall) |
| + | *Multiplet mode in POSTPAN, Regression (fall) |
| + | *Multiplet mode in dithering (spring) |
| + | |- |
| + | | || Dithering analysis for PREX system |
| + | |- |
| + | | Rich || 240 Hz speed/efficiency |
| + | |} |
| |- | | |- |
| ! Detector prep | | ! Detector prep |
Line 73: |
Line 81: |
| | Mark | | | Mark |
| | | | | |
− | * Electron detector (Alex, Bob)
| + | {| border="1" cellpadding="5" cellspacing="0" |
| + | |- |
| + | | Alex, Bob || |
| + | Electron detector (Alex, Bob) |
| ** repair edet planes | | ** repair edet planes |
| ** complete tests | | ** complete tests |
| ** reinstall | | ** reinstall |
− | * Increase IR cavity power (Mark)
| + | |- |
− | * Understand transfer function
| + | | Mark || Increase IR cavity power || Begun testing moving lense 3 to improve mode matching. Significant steering observed -> might take a while to optimise |
− | ** Find script that runs 1/4 wave plate scan | + | |- |
− | * Shine green laser through cavity
| + | | Mark || Transfer function |
− | * High-rate helicity flip tests (Alex, Bob)
| + | *1/4 wave plate scan |
− | * integrate electron DAQ and FADC (Gregg, Bob?)
| + | | Quarter wave plate scan performed, analysis underway |
− | * Photon Detector
| + | |- |
− | ** install positioning scints (Brian Q.)
| + | | Sirish, Al, Vlad, Abdurahim || Shine green laser through cavity |
− | ** install new tube/base with linearity test (Megan)
| + | |- |
− | ** LED studies of PMT linearity (Megan)
| + | | Alex, Bob || High-rate helicity flip tests |
| + | |- |
| + | | Greg, Bob? || integrate electron DAQ and FADC |
| + | |- |
| + | | Brian Q., Megan || Photon Detector |
| + | * install positioning scints (Brian Q.) |
| + | * install new tube/base with linearity test (Megan) |
| + | * LED studies of PMT linearity (Megan) |
| + | |} |
| |- | | |- |
| ! Accelerator dev/liason | | ! Accelerator dev/liason |
| | Mark and Dustin | | | Mark and Dustin |
| | | | | |
− | * Run 8 more cables from HAPPEx DAQ to source table (Mark,Riad)
| + | {|border="1" cellpadding="5" cellspacing="0" style="text-align:left" |
− | ** Kent emailed Riad the requirements for cabling and asked for 2 shifts during the week of July 27, and two shifts in the period Aug 5-8.
| + | |- |
− | * coordinate high-rate flip test (ATLIS)
| + | | Mark || Run 8 more cables from HAPPEx DAQ to source table || Not necessary, already existed |
− | * coordinate low-current running (ATLIS)
| + | |- |
− | * coordinate spin dance for polarization optimization (ATLIS?)
| + | | || coordinate high-rate flip test (ATLIS) |
| + | |- |
| + | | || coordinate low-current running (ATLIS) |
| + | |- |
| + | | || coordinate spin dance for polarization optimization (ATLIS?) |
| + | |} |
| |- | | |- |
| ! Modulation | | ! Modulation |
Line 119: |
Line 143: |
| |- | | |- |
| ! Documentation and administration | | ! Documentation and administration |
− | | | + | | Mark |
| | | | | |
− | * ALIST for watercell removal procedure (Dustin)
| + | {| border="1" cellpadding="5" cellspacing="0" |
− | * commissioning plan / schedule (Kent)
| + | |- |
− | * COO, RSAD, TSOP must be produced. Shift workers must be asked to read and sign before shift. (Kent)
| + | | Dustin || ALIST for watercell removal procedure |
− | * Target training must be organised and advertised. Contact Dave Meekins and JP. (Dustin)
| + | |- |
− | * Shift schedule and signup sheet (Mark)
| + | | Kent || commissioning plan / schedule |
− | * Run coordinator signup (Xiaochao)
| + | |- |
− | * WAC signup (Mark)
| + | |Kent || COO, RSAD, TSOP must be produced. Shift workers must be asked to read and sign before shift. |
− | * Online documentation for shift workers
| + | |- |
− | * Manpower schedule (Mark)
| + | | Dustin || Target training must be organised and advertised. Contact Dave Meekins and JP. |
− | * Contact list update (Mark)
| + | |- |
− | * Image Library
| + | | Mark || Shift schedule and signup sheet || Done |
| + | |- |
| + | | Xiaochao || Run coordinator signup || Done and published |
| + | |- |
| + | | Mark || WAC signup |
| + | |- |
| + | | Mark || Online documentation for shift workers |
| + | |- |
| + | | Mark || Manpower schedule || Email sent, wiki page produced [[parity availability]] still sparse |
| + | |- |
| + | | Mark || Contact list update || Wiki page created [[parity contact]], email sent out |
| + | |- |
| + | | || Image Library (what is this?) |
| + | |} |
| |- | | |- |
| ! PREX | | ! PREX |
HAPPEx III Work List
What |
Postdoc |
Description
|
DAQ
|
Dustin
|
- AutoDB configuration
- Recover GreenMonster
- Make list of epics words for DAQ ()
- Sync monitor between crates (Luis)
- Pedestal noise
- Pickup tests
- BMW scripts (Kent)
- Hall C BCM signal
- New PITA QASY (high-speed) feedback script
- Test new helicity board
- New config file mechanism (Bob?)
- Test injector crate
- Implement/test LHRS crate (Bob)
- High-rate DAQ system tests
- ET system test at 240 Hz
|
Analysis chain
|
Mark
|
Kent/Rupesh |
Decode Qweak ROC structure in PAN |
Done
|
Mark |
Run analysis on HAPPEx II data (Mark)
|
Rupesh |
QWeak ADC -> PAN |
Done
|
Rich |
- Multiplet mode in PAN (fall)
- Multiplet mode in POSTPAN, Regression (fall)
- Multiplet mode in dithering (spring)
|
|
Dithering analysis for PREX system
|
Rich |
240 Hz speed/efficiency
|
|
Detector prep
|
Dustin
|
Cosmics Checkout, PMT linearity tests, LED system, Mounting hardware and angles
- PMT DC linearity (Luis)
- New (Bogdan) Burle PMT
- Photonics PMT
- New/Old base
- Test for He poisoning (strong baseline current and look for double pulsing)
- Calculate light yield from HAPPEx III detector (KK/Wexler) [DONE]
- Online LED pulse linearity hardware (Kent)
- LED mounting (Rupesh)
- Studies once hardware is available (Rupesh)
- Attenuation study (Rupesh, Dustin)
- Locate/Test/Update mounting hardware (Rupesh/Kent)
- Determine installation spec: angles and position (Dustin)
- Installation plan, test installation??
- Test detector pedestal noise (Rupesh)
- Lumi
- Check running for lumi health
- Identify spare tubes
- Test pedestals
- Electronics
- pulse LED linearity testing system
- Relays between counting and integrating mode
- PREX test configuration design/installation (Dustin)
|
Moller polarimeter
|
Dustin
|
- Dustin, Luis and Sasha become experts at running the Moller polarimeter
- New Custom-FADC DAQ
- Spilt signals between old and new DAQs
- pre-stage FADC DAQ work
- implement parallel DAQ in Fall '09, possibly main DAQ for PREX (Brad, Eugene, Bob)
|
Compton polarimeter
|
Mark
|
Alex, Bob |
Electron detector (Alex, Bob)
- repair edet planes
- complete tests
- reinstall
|
Mark |
Increase IR cavity power |
Begun testing moving lense 3 to improve mode matching. Significant steering observed -> might take a while to optimise
|
Mark |
Transfer function
|
Quarter wave plate scan performed, analysis underway
|
Sirish, Al, Vlad, Abdurahim |
Shine green laser through cavity
|
Alex, Bob |
High-rate helicity flip tests
|
Greg, Bob? |
integrate electron DAQ and FADC
|
Brian Q., Megan |
Photon Detector
- install positioning scints (Brian Q.)
- install new tube/base with linearity test (Megan)
- LED studies of PMT linearity (Megan)
|
|
Accelerator dev/liason
|
Mark and Dustin
|
Mark |
Run 8 more cables from HAPPEx DAQ to source table |
Not necessary, already existed
|
|
coordinate high-rate flip test (ATLIS)
|
|
coordinate low-current running (ATLIS)
|
|
coordinate spin dance for polarization optimization (ATLIS?)
|
|
Modulation
|
|
- Revive BMW scripts
- Test BMW system
- Add new magnets to arc
- Revive Hall B,C and compton signals
- Design PREX modulation system
- Modulation "spec" document (Kent)
|
Installation planning
|
|
- When is the detector going in?
- What tools are needed?
- Give Ed a list of surveys that are required
|
Commissioning planning
|
|
|
Documentation and administration
|
Mark
|
Dustin |
ALIST for watercell removal procedure
|
Kent |
commissioning plan / schedule
|
Kent |
COO, RSAD, TSOP must be produced. Shift workers must be asked to read and sign before shift.
|
Dustin |
Target training must be organised and advertised. Contact Dave Meekins and JP.
|
Mark |
Shift schedule and signup sheet |
Done
|
Xiaochao |
Run coordinator signup |
Done and published
|
Mark |
WAC signup
|
Mark |
Online documentation for shift workers
|
Mark |
Manpower schedule |
Email sent, wiki page produced parity availability still sparse
|
Mark |
Contact list update |
Wiki page created parity contact, email sent out
|
|
Image Library (what is this?)
|
|
PREX
|
|
- Radiation issues for PREX
- Possible Shielding? Thermalized neutron estimates to be done with RSAD (Pavel)
- PREX collimators and Sieve
- Finalize the design
- Manufacture
- Septum
- Manufacturing
- Testing in testlab (Fall 2009)
- Build PREX target ladder
- GEM detectors
- Needed for high-rate <math>Q^2</math> during PREX (Nilanga, Kent, KK)