Difference between revisions of "GEM study"
From Hall A Wiki
Line 1: | Line 1: | ||
*[[Trigger setup]] | *[[Trigger setup]] | ||
− | **[[lead glass cal.]] | + | **[[lead glass cal. | Old lead glass electronics]] |
**[[Trigger Wiring Diagram | Old Trigger Setup]] | **[[Trigger Wiring Diagram | Old Trigger Setup]] | ||
*[[VME Controller Setup]] | *[[VME Controller Setup]] |
Revision as of 14:50, 31 May 2011
- Trigger setup
- VME Controller Setup
- Database Instructions for CRAM sequencer 551b ( Old Database Instructions for CRAM sequencer 551)_
- Roc1 Setup
- Pedestal Setup
- Coda 2.6 Setup ( Old Coda 2.5 Setup)
- New Coda 2.6 Runcontrol Setup Instructions ( Old Coda 2.5 Runcontrol Instructions)
- CRL Code
- Analysis Software Setup
- Data Log
- GEM Data Log during Hall A test in May 2011
- Channel Problems
You can find more information on GEMs at the Hall A PREX GEM page: