Difference between revisions of "G2p"
From Hall A Wiki
Line 9: | Line 9: | ||
*The GEP [http://hallaweb.jlab.org/experiment/E08-007/ website]. | *The GEP [http://hallaweb.jlab.org/experiment/E08-007/ website]. | ||
− | == | + | ==Shift Worker Information== |
− | * | + | *Shift Worker [https://hallaweb.jlab.org/wiki/index.php/G2p_shifts Instructions] |
− | + | *Expert Shift Worker [https://hallaweb.jlab.org/wiki/index.php/g2p_Expert_Shifts Instructions] | |
− | + | ||
− | * | + | |
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
==Runplan/Schedule== | ==Runplan/Schedule== | ||
Line 31: | Line 22: | ||
*The JLab [http://www.jlab.org/exp_prog/experiment_schedule/ schedule] webpage | *The JLab [http://www.jlab.org/exp_prog/experiment_schedule/ schedule] webpage | ||
*[http://clasweb.jlab.org/spin_rotation/ Spin Rotator] website | *[http://clasweb.jlab.org/spin_rotation/ Spin Rotator] website | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
==DAQ== | ==DAQ== | ||
Line 60: | Line 43: | ||
==Polarized Target== | ==Polarized Target== | ||
*[[Solid Polarized Target]] | *[[Solid Polarized Target]] | ||
+ | |||
+ | ==Spectrometer Optics== | ||
+ | *[https://hallaweb.jlab.org/wiki/index.php?title=G2p_optics g2p optics page] | ||
+ | |||
+ | |||
+ | ==Weekly Meetings== | ||
+ | *Analysis Meetings are held every Wednesday at 2:30 in F224. ([https://hallaweb.jlab.org/wiki/index.php/G2p_Analysis_Minutes minutes]) ([https://hallaweb.jlab.org/wiki/index.php/G2p_Weekly_Analysis Agendas]) | ||
+ | *Target Meetings are held every other Thursdays at 1:30 in F224. ([https://hallaweb.jlab.org/wiki/index.php/G2p_Target_Minutes minutes]) | ||
+ | *Beam Transport Meetings are held every Tuesday at 8:30 in MCC. ([http://hallaweb.jlab.org/experiment/E08-027/meetings/beamline/ minutes]) | ||
+ | *Weekly Hall A meeting Run Coordinator ([https://hallaweb.jlab.org/wiki/index.php/G2pRC Reports]) | ||
+ | |||
+ | ==Collaboration Meetings== | ||
+ | *[https://hallaweb.jlab.org/wiki/index.php/G2p_Safety_Readiness_Review January 17, 2012 (JLab Safety/Readiness Review)] | ||
+ | *[http://hallaweb.jlab.org/experiment/g2p/status/ August 30, 2011 (Hall A Review)] | ||
+ | *[http://hallaweb.jlab.org/experiment/g2p/review/ May 6, 2011 (Readiness Review)] ([http://hallaweb.jlab.org/experiment/g2p/review/G2P_review_report.pdf Final Report]) | ||
+ | *[http://hallaweb.jlab.org/experiment/g2p/meetings/041811/ April 18, 2011] ([http://hallaweb.jlab.org/experiment/g2p/meetings/041811/talks/minutes_g2pcollab_041811.pdf minutes]) | ||
+ | *[http://hallaweb.jlab.org/experiment/g2p/meetings/020411/ Feb. 4, 2011] | ||
+ | *[http://hallaweb.jlab.org/experiment/g2p/meetings/093010/index.html Sep. 30, 2010] ([http://hallaweb.jlab.org/experiment/g2p/meetings/093010/talks/093010_collab_notes.pdf minutes]) | ||
Revision as of 14:06, 28 February 2012
Contents
- 1 The g2p Family of Experiments
- 2 Shift Worker Information
- 3 Runplan/Schedule
- 4 DAQ
- 5 Analysis
- 6 Polarized Target
- 7 Spectrometer Optics
- 8 Weekly Meetings
- 9 Collaboration Meetings
- 10 Safety Documentation
- 11 Talks and Presentations
- 12 Relevent Theses
- 13 Relevent Publications
- 14 Technotes
- 15 Links
- 16 Mailing List
- 17 Help
The g2p Family of Experiments
E08-027 will measure the proton spin structure function g2p in Jefferson Lab's Hall A.
- Spokesmen: A. Camsonne , J.P. Chen, D. Crabb and K. Slifer (contact person).
- Full details of the physics goals are provided in the proposal
- The g2p website.
E08-007 will measure the proton spin structure function ratio GE/GM concurrently with E08-027.
- Spokesmen: R. Gilman, D. Higinbotham, G. Ron (contact), J. Arrington, D. Day, A. Sarty.
- The GEP website.
Shift Worker Information
- Shift Worker Instructions
- Expert Shift Worker Instructions
Runplan/Schedule
- The shift schedule
- Draft Accelerator Schedule # 8 (Jan. 24, 2012): (Gantt) (xls)
- The latest run plan (Feb. 09, 2012)
- Runplan for Feb Commissioning.
- Runplan for December Commissioning.
- The JLab schedule webpage
- Spin Rotator website
DAQ
- How to Change HV
- Happex DAQ for g2p experiment
- g2p Crate Maps
- S1 Scintillator
- Crate Boot Parameters
- g2p/gep DAQ How-To (Long Version)
- HRS CODA Configurations
- 3rd Arm DAQ for g2p experiment
Analysis
- Analysis elog
- Replay guide (also root and hall A analyzer environment setup).
- Geant4 environment setup
- Good Electron Cuts
Polarized Target
Spectrometer Optics
Weekly Meetings
- Analysis Meetings are held every Wednesday at 2:30 in F224. (minutes) (Agendas)
- Target Meetings are held every other Thursdays at 1:30 in F224. (minutes)
- Beam Transport Meetings are held every Tuesday at 8:30 in MCC. (minutes)
- Weekly Hall A meeting Run Coordinator (Reports)
Collaboration Meetings
- January 17, 2012 (JLab Safety/Readiness Review)
- August 30, 2011 (Hall A Review)
- May 6, 2011 (Readiness Review) (Final Report)
- April 18, 2011 (minutes)
- Feb. 4, 2011
- Sep. 30, 2010 (minutes)
Safety Documentation
- g2p Safety documentation
Talks and Presentations
(please post any recent presentations here)
- 2011 Al Gavalya's overview of Hall A
- 2011 NSTAR, K. Slifer (pdf)
- 2011 Hall A Workshop, K. Slifer (ppt)
- 2010 One Slide Summary ppt
- 2009 E08-027/E08-007 Presentation to R. McKeown, (pdf)
Relevent Theses
Relevent Publications
- Axial anomaly and the δLT puzzle. arXiv:1103.4892
Technotes
Links
Ron Group at Hebrew University of Jerusalem.
Mailing List
There are two mailing lists relevant to g2p:
- g2p@jlab.org : General announcements
- g2p_ana@jlab.org : Weekly analysis
You can subscribe to both at http://mailman.jlab.org
Help
- HOW-TO use the g2pwiki.