Difference between revisions of "G2p"

From Hall A Wiki
Jump to: navigation, search
(The g2p Family of Experiments)
Line 1: Line 1:
==The g2p Family of Experiments ==
+
==The Experiments==
 
<B>E08-027</B> will measure the proton spin structure function g2p in Jefferson Lab's Hall A.
 
<B>E08-027</B> will measure the proton spin structure function g2p in Jefferson Lab's Hall A.
*Spokesmen:  [mailto:camsonne@jlab.org A. Camsonne ], [mailto:jpchen@jlab.org J.P. Chen], [mailto:crabb@jlab.org D. Crabb] and [mailto:slifer@jlab.org K. Slifer (contact person)].  
+
*Spokesmen:  A. Camsonne, J.P. Chen, D. Crabb and K. Slifer (contact).  
 
*Full details of the physics goals are provided in the [http://hallaweb.jlab.org/experiment/g2p/docs/PAC33/dlt.pdf proposal]
 
*Full details of the physics goals are provided in the [http://hallaweb.jlab.org/experiment/g2p/docs/PAC33/dlt.pdf proposal]
 
*The g2p [http://hallaweb.jlab.org/experiment/g2p/ website].
 
*The g2p [http://hallaweb.jlab.org/experiment/g2p/ website].
  
<B>E08-007</B> will measure the proton spin structure function ratio GE/GM concurrently with E08-027.
+
<B>E08-007</B> will measure the proton spin structure function ratio GE/GM  
 
*Spokesmen: R. Gilman, D. Higinbotham,  G. Ron (contact), J. Arrington, D. Day, A. Sarty.
 
*Spokesmen: R. Gilman, D. Higinbotham,  G. Ron (contact), J. Arrington, D. Day, A. Sarty.
 
*The GEP [http://hallaweb.jlab.org/experiment/E08-007/ website].
 
*The GEP [http://hallaweb.jlab.org/experiment/E08-007/ website].
 
  
 
==Runplan and Schedule==
 
==Runplan and Schedule==

Revision as of 14:22, 28 February 2012

The Experiments

E08-027 will measure the proton spin structure function g2p in Jefferson Lab's Hall A.

  • Spokesmen: A. Camsonne, J.P. Chen, D. Crabb and K. Slifer (contact).
  • Full details of the physics goals are provided in the proposal
  • The g2p website.

E08-007 will measure the proton spin structure function ratio GE/GM

  • Spokesmen: R. Gilman, D. Higinbotham, G. Ron (contact), J. Arrington, D. Day, A. Sarty.
  • The GEP website.

Runplan and Schedule


Shift Worker Information


DAQ


Analysis


Polarized Target


Spectrometer Optics


Weekly Meetings

  • Analysis Meetings are held every Wednesday at 2:30 in F224. (minutes) (Agendas)
  • Target Meetings are held every other Thursdays at 1:30 in F224. (minutes)
  • Beam Transport Meetings are held every Tuesday at 8:30 in MCC. (minutes)
  • Weekly Hall A meeting Run Coordinator (Reports)


Collaboration Meetings


Safety Documentation


Talks and Presentations

  • 2011 Al Gavalya's overview of Hall A
  • 2011 NSTAR, K. Slifer (pdf)
  • 2011 Hall A Workshop, K. Slifer (ppt)
  • 2010 One Slide Summary ppt
  • 2009 E08-027/E08-007 Presentation to R. McKeown, (pdf)


Relevent Theses


Relevent Publications


Technotes


Links


Mailing List

There are two mailing lists relevant to g2p:

  • g2p@jlab.org : General announcements
  • g2p_ana@jlab.org : Weekly analysis

You can subscribe to both at http://mailman.jlab.org


Help