Difference between revisions of "Docs"

From Hall A Wiki
Jump to: navigation, search
Line 6: Line 6:
 
*Scintillator bar and light guide surface roughening tests in Glasgow 2020, R. Montgomery et al. [[https://hallaweb.jlab.org/wiki/images/b/ba/Roughening_Glueing_May2020.pdf]]
 
*Scintillator bar and light guide surface roughening tests in Glasgow 2020, R. Montgomery et al. [[https://hallaweb.jlab.org/wiki/images/b/ba/Roughening_Glueing_May2020.pdf]]
  
Mapping Documents
+
Mapping Documents:
*High voltage and low voltage mapping up to Feb 2019 description
+
*Updated mapping for cosmics running 2021 currently in preparation
*Accompanying high voltage and low voltage mapping up to Feb 2019 excel sheet
+
*High voltage and low voltage mapping up to Feb 2019 description (layout OUTDATED, will remove when new mapping uploaded)
* Updated mapping for cosmics running 2021 currently in preparation
+
*Accompanying high voltage and low voltage mapping up to Feb 2019 excel sheet (layout OUTDATED, will remove when new mapping uploaded)
  
 
Schematics:
 
Schematics:
*
+
*HV patch panels, J. Annand, A. Clarkson
 +
*Schematic for LV distributor panel is found in figure 5 of "Original electronics plan" document listed in general documents above.
  
Manuals:
+
Manuals/Spec sheets:
*CAEN v792
+
*PMTs
 +
*Scintillator bars
 +
*CAEN V792 [[https://hallaweb.jlab.org/wiki/images/a/a1/V792_rev18.pdf]]
 
*CAEN V1190
 
*CAEN V1190
 
*CAEN SY1527LC mainframe
 
*CAEN SY1527LC mainframe

Revision as of 14:38, 8 February 2021

General Documents:

  • BigBite Timing hodoscope Technical Specifications (design and performance requirements), J. Annand et al. [[1]]
  • Software requirements, R. Montgomery et al. [[2]]
  • High voltage and low voltage set up and operation for hodoscope in TEDf with cosmics, J. Annand et al. [[3]]
  • Original electronics plan (describes chain from PMT to final VME readout, including high voltage and low voltage)[[4]]
  • Scintillator bar and light guide surface roughening tests in Glasgow 2020, R. Montgomery et al. [[5]]

Mapping Documents:

  • Updated mapping for cosmics running 2021 currently in preparation
  • High voltage and low voltage mapping up to Feb 2019 description (layout OUTDATED, will remove when new mapping uploaded)
  • Accompanying high voltage and low voltage mapping up to Feb 2019 excel sheet (layout OUTDATED, will remove when new mapping uploaded)

Schematics:

  • HV patch panels, J. Annand, A. Clarkson
  • Schematic for LV distributor panel is found in figure 5 of "Original electronics plan" document listed in general documents above.

Manuals/Spec sheets:

  • PMTs
  • Scintillator bars
  • CAEN V792 [[6]]
  • CAEN V1190
  • CAEN SY1527LC mainframe
  • CAEN A1932A HV distributer modules
  • AGILENT PSU
  • Wiener VME64x6023 crate