Docs
From Hall A Wiki
Contents
Specific Fall Run 2021 Items
- High Voltage Mapping. This is a pdf of the excel spreadsheet passed to epics. Contact Ralph Marinaro, Steve Wood or Rachel Montgomery for the actual spreadsheet. [[1]]
- High and low voltage how to for shifters. [[2]]
- Analysis how to for shifters [[3]]
- High and low voltage how to for shifters after tedbbdaq failure (jan 2022). [[4]]
Expert and General How to Documents
- High voltage and low voltage set up and operation for hodoscope in TEDf with cosmics, including EPICS instructions [[5]]
Software
- SBSTimingHodoscope class which is under continuous development can be cloned from : https://github.com/rachel-m/SBS-offline.git on the branch BB_TH_dev
- Analysis and calibration macros, which are also under continuous development, can be found on the main branch at: https://github.com/rachel-m/HodoSW
- Document about SBS-offline for the hodoscope. The pdf and .docx files are also found on the github. If you add anything relevent to the TH class in SBS-offline please update the docx and pdf files, here and on the git hub.
- Document about the calibration scripts. The pdf and .docx files are also found on the github. If you add anything to the calibration macros please update the docx and pdf files on this page and the git hub.
- Document about the online display for shift workers. The pdf and .docx files are also found on the github. If you add anything to the online display and shift worker code please update the docx and pdf files on this page and the git hub.
General Documents
- BigBite Timing hodoscope Technical Specifications (design and performance requirements), J. Annand et al. [[6]]
- Software requirements, R. Montgomery et al. [[7]]
- Original electronics plan, J. Annand et al. (describes chain from PMT to final VME readout, including high voltage and low voltage)[[8]]
- Scintillator bar and light guide surface roughening tests in Glasgow 2020, R. Montgomery et al. [[9]]
Mapping Documents
- Updated complete mapping for cosmics running 2021 (G. Penman, May 2021 during cosmic comissioning) [[10]]
- Updated cosmics mapping spreadsheet (R. Marinaro, G. Penman, May 2021) [[11]]
- Cosmics channel mapping (R. Marinaro, May 2021 during cosmic commissioning) [[12]]
Schematics
- HV patch panels, J. Annand, A. Clarkson [[13]]
- Schematic for LV distributor panel is found in figure 5 of "Original electronics plan" document [[14]]
- Schematic for PMT bases is found in figure 3 of "Original electronics plan" document [[15]]
- Schematic of NINO front end cards is found in figure 4 of "Original electronics plan" document [[16]]
Manuals/Spec sheets for components of hodoscope
- Electron Tubes ET9124 SB type PMTs [[17]]
- Eljen Technology EJ200 scintillator bars [[18]]
- Eljen technology UVT acrylic light guides [[19]]
- DYMAX optical cure epoxy - check which specific model number was used in Jlab repairs
- Cage HV connectors at HV patch panel connections [[20]]
- CAEN V792 [[21]]
- CAEN V1190 [[22]]
- CAEN SY1527LC HV mainframe, 19" wide, 8U [[23]]
- Accessory CAEN A1932AN 48 channel HV distributer modules for mainframe [[24]]
- Accessory CAEN A1531 primary PSU for HV mainframe - no specific manual online, contacted CAEN and they refer to this document [[25]]
- AGILENT N5761A DC power supply unit for NINO front end cards, 19" wide, 1U, rack-mountable [[26]]
- Wiener 6U VME64x 6023 crate [[27]]