Difference between revisions of "Pol He-3 Target Information GEn"

From Hall A Wiki
Jump to: navigation, search
(Production Target Cell Information)
(Target Operator Instructions)
Line 7: Line 7:
  
 
== Target Operator Instructions ==
 
== Target Operator Instructions ==
* New PolHe3 Target Training Slides [https://sbs.jlab.org/DocDB/0003/000330/001/TO_training%20slides_halla.pdf]
+
* New PolHe3 Target Training Slides [https://sbs.jlab.org/DocDB/0003/000330/008/TO_training%20slides_halla.pdf]
 
* Old PolHe3 Target Training Slides [https://hallcweb.jlab.org/experiments/PolHe3-2019/PolHe3_Target_Training_30Jul2020.pdf]
 
* Old PolHe3 Target Training Slides [https://hallcweb.jlab.org/experiments/PolHe3-2019/PolHe3_Target_Training_30Jul2020.pdf]
 
* PNMR Training slides
 
* PNMR Training slides

Revision as of 14:56, 31 January 2023

Cell "Talisker" mounted in target enclosure

Experiment Information

The GEn experiment is determining the electric form factor of the neutron to high Q2 by measuring the ratio of the electric form factor of the neutron to proton via recoil polarimetry. The planned kinematic points have changed slightly from the original proposal; however, the impact of these measurements remains intact. The new kinematics are shown Figure 1 along with the expected uncertainty compared to the originally proposed kinematics. These error bars include current estimate of target and datector performance.

Target Operator Instructions

Checklists

Target Polarization

Measurements UPDATE FOR GEn!!

Target Meetings

Weekly Meetings

Expert Instructions

Target Cell

Reference Cell

Cooling Jet Alignment

Pol He3 Field Mapping Data

Pol He3 Field Map from TOSCA simulation

Circular Raster Information

Reset Target Ladder Motion Control

Reboot instructions

Cable/RTD/Signal Maps

Fiber RTD hardware trip points

PolHe3 Alarm Handler defaults

Reference Cell Information

  • Documents from Todd?

Production Target Cell Information

General Specifications for Target Cells

documents from Gordon?

Currently Installed Cell

  • Hunter
    • Installed in target:

Cells Being Readied for Installation

  • Pristine
    • Undergoing tests at UVA
  • Tiger
    • Undergoing tests at UVA

Older Installed Cells

  • Ukraine
    • Installed in target: 10/03/2022 to 10/13/2022
    • Used for commissioning
    • Characterization Document:
  • Hunter
    • Installed in target: 10/14/2022 to
    • Used for commissioning
    • Characterization Document:
  • Windmill
    • RIP, you were a great cell before exploding

Addition Documentation

information on study of magnetic field alignment in cells?

Additional Documentation

Target CAD Files/Photos

  • Selected Target Shop Drawings

Target Ladder

Holding Field

Safety Documents

Manuals