Difference between revisions of "D2n Talks/Reports"
From Hall A Wiki
(→23 June 2009 Meeting:) |
(→23 June 2009 Meeting:) |
||
Line 39: | Line 39: | ||
* Progress Reports: | * Progress Reports: | ||
** Matt Posik: Big Bite Cerenkov Analysis [[Media:BB_cer_06_23_09.pdf]] | ** Matt Posik: Big Bite Cerenkov Analysis [[Media:BB_cer_06_23_09.pdf]] | ||
+ | ** David Flay: LHRS Pion Rejector Analysis [[Media:DF_LHRS_6_23_09.pdf]] |
Revision as of 14:52, 23 June 2009
Contents
How to connect to a d2n VNC Session
Earlier Collaboration Meetings
Add progress reports below.
17 April 2009 Phone meeting:
- Notes: d2n_meeting-17Apr2009.txt
12 May 2009 Phone Meeting:
- Progress Reports:
- Matt Posik: BB Cerenkov gain Media:BBcer_1pe_gain.pdf
- David Flay: LHRS Pion Rejector Calibration Media:Prl_5_12_09.pdf
22 May 2009 Transversity Collaboration Meeting:
- Progress Reports:
- BigBite Optics Media:BB_Optics-Xin.pdf
- Analysis block diagram (Jiang) Media:transn_collaboration_meet_052209-Jiang.pdf
- Target Water NMR Analysis (Yi Zhang) Media:Target_Water_NMR-ZhangYi.pdf
- LHRS Calibrations (Dutta) Media:LRHS_Calib-Dutta.pdf
- Coincidence Timing and Farm Production Media:Coin_Timing_and_Farm_Production-Huang.pdf
- BigBite Shower, Scaler, and Beamline Calib Media:BB_Shower_Scaler_Beamline_Calib-Allada.pdf
26 May 2009 Phone Meeting:
- Progress Reports:
- Diana Parno: Compton analysis Media:Parno_26May09.pdf
- Matt Posik: BB Cerenkov Analysis Media:cer_tdc.pdf
- David Flay: LHRS Calibration Analysis Media:prl_5_26_09.pdf
11 June 2009 Meeting:
- Progress Reports:
- Diana Parno: Special runs and Compton rate cuts Media:Parno11Jun09.pdf
23 June 2009 Meeting:
- Progress Reports:
- Matt Posik: Big Bite Cerenkov Analysis Media:BB_cer_06_23_09.pdf
- David Flay: LHRS Pion Rejector Analysis Media:DF_LHRS_6_23_09.pdf