Line 59: Line 59:
 
** pulse LED linearity testing system
 
** pulse LED linearity testing system
 
** Relays between counting and integrating mode
 
** Relays between counting and integrating mode
 +
* PREX test configuration design/installation (Dustin)
 
|-
 
|-
 
! Moller polarimeter
 
! Moller polarimeter
 
| Dustin
 
| Dustin
| Dustin, Luis and Sasha become experts at running the Moller polarimeter  
+
|  
 +
* Dustin, Luis and Sasha become experts at running the Moller polarimeter
 +
* New [http://hallaweb.jlab.org/parity/prex/mollfadc.pdf Custom-FADC DAQ]
 +
** Spilt signals between old and new DAQs
 +
** pre-stage FADC DAQ work
 +
** implement parallel DAQ in Fall '09, possibly main DAQ for PREX (Brad, Eugene, Bob)
 
|-
 
|-
 
! Compton polarimeter
 
! Compton polarimeter
Line 87: Line 93:
 
* Run 8 more cables from HAPPEx DAQ to source table (Mark,Riad)
 
* Run 8 more cables from HAPPEx DAQ to source table (Mark,Riad)
 
** Kent emailed Riad the requirements for cabling and asked for 2 shifts during the week of July 27, and two shifts in the period Aug 5-8.  
 
** Kent emailed Riad the requirements for cabling and asked for 2 shifts during the week of July 27, and two shifts in the period Aug 5-8.  
* coordinate high-rate flip test
+
* coordinate high-rate flip test (ATLIS)
* coordinate low-current running
+
* coordinate low-current running (ATLIS)
* coordinate spin dance for polarization optimization
+
* coordinate spin dance for polarization optimization (ATLIS?)
 
|-
 
|-
 
! Modulation
 
! Modulation
Line 115: Line 121:
 
|  
 
|  
 
|
 
|
 +
* ALIST for watercell removal procedure (Dustin)
 +
* commissioning plan / schedule (Kent)
 
* COO, RSAD, TSOP must be produced.  Shift workers must be asked to read and sign before shift. (Kent)
 
* COO, RSAD, TSOP must be produced.  Shift workers must be asked to read and sign before shift. (Kent)
 
* Target training must be organised and advertised. Contact Dave Meekins and JP. (Dustin)
 
* Target training must be organised and advertised. Contact Dave Meekins and JP. (Dustin)

Revision as of 13:39, 28 July 2009

HAPPEx III Work List
What Postdoc Description
DAQ Dustin
  • AutoDB configuration
  • Recover GreenMonster
  • Make list of epics words for DAQ ()
  • Sync monitor between crates (Luis)
  • Pedestal noise
  • Pickup tests
  • BMW scripts (Kent)
  • Hall C BCM signal
  • New PITA QASY (high-speed) feedback script
  • Test new helicity board
  • New config file mechanism (Bob?)
  • Test injector crate
  • Implement/test LHRS crate (Bob)
  • High-rate DAQ system tests
  • ET system test at 240 Hz
Analysis chain Mark
  • Decode Qweak ROC structure in PAN (Rupesh/Kent)
  • Run analysis on HAPPEx II data (Mark)
  • QWeak ADC -> PAN (Rupesh)
  • Multiplet (Mark to contact Richard)
    • Multiplet mode in PAN (fall,Richard)
    • Multiplet mode in POSTPAN, Regression (fall)
    • Multiplet mode in dithering (spring)
  • Dithering analysis for PREX system
  • 240 Hz speed/efficiency (Rich)
Detector prep Dustin Cosmics Checkout, PMT linearity tests, LED system, Mounting hardware and angles
  • PMT DC linearity (Luis)
    • New (Bogdan) Burle PMT
    • Photonics PMT
    • New/Old base
    • Test for He poisoning (strong baseline current and look for double pulsing)
  • Calculate light yield from HAPPEx III detector (KK/Wexler) [DONE]
  • Online LED pulse linearity hardware (Kent)
    • LED mounting (Rupesh)
    • Studies once hardware is available (Rupesh)
  • Attenuation study (Rupesh, Dustin)
  • Locate/Test/Update mounting hardware (Rupesh/Kent)
  • Determine installation spec: angles and position (Dustin)
    • Installation plan, test installation??
  • Test detector pedestal noise (Rupesh)
  • Lumi
    • Check running for lumi health
    • Identify spare tubes
    • Test pedestals
  • Electronics
    • pulse LED linearity testing system
    • Relays between counting and integrating mode
  • PREX test configuration design/installation (Dustin)
Moller polarimeter Dustin
  • Dustin, Luis and Sasha become experts at running the Moller polarimeter
  • New Custom-FADC DAQ
    • Spilt signals between old and new DAQs
    • pre-stage FADC DAQ work
    • implement parallel DAQ in Fall '09, possibly main DAQ for PREX (Brad, Eugene, Bob)
Compton polarimeter Mark
  • Electron detector (Alex, Bob)
    • repair edet planes
    • complete tests
    • reinstall
  • Increase IR cavity power (Mark)
  • Understand transfer function
    • Find script that runs 1/4 wave plate scan
  • Shine green laser through cavity
  • High-rate helicity flip tests (Alex, Bob)
  • integrate electron DAQ and FADC (Gregg, Bob?)
  • Photon Detector
    • install positioning scints (Brian Q.)
    • install new tube/base with linearity test (Megan)
    • LED studies of PMT linearity (Megan)
Accelerator dev/liason Mark and Dustin
  • Run 8 more cables from HAPPEx DAQ to source table (Mark,Riad)
    • Kent emailed Riad the requirements for cabling and asked for 2 shifts during the week of July 27, and two shifts in the period Aug 5-8.
  • coordinate high-rate flip test (ATLIS)
  • coordinate low-current running (ATLIS)
  • coordinate spin dance for polarization optimization (ATLIS?)
Modulation
  • Revive BMW scripts
  • Test BMW system
  • Add new magnets to arc
  • Revive Hall B,C and compton signals
  • Design PREX modulation system
  • Modulation "spec" document (Kent)
Installation planning
  • When is the detector going in?
  • What tools are needed?
  • Give Ed a list of surveys that are required
Commissioning planning
Documentation and administration
  • ALIST for watercell removal procedure (Dustin)
  • commissioning plan / schedule (Kent)
  • COO, RSAD, TSOP must be produced. Shift workers must be asked to read and sign before shift. (Kent)
  • Target training must be organised and advertised. Contact Dave Meekins and JP. (Dustin)
  • Shift schedule and signup sheet (Mark)
  • Run coordinator signup (Xiaochao)
  • WAC signup (Mark)
  • Online documentation for shift workers
  • Manpower schedule (Mark)
  • Contact list update (Mark)
PREX
  • Radiation issues for PREX
    • Possible Shielding? Thermalized neutron estimates to be done with RSAD (Pavel)
  • PREX collimators and Sieve
    • Finalize the design
    • Manufacture
  • Septum
    • Manufacturing
    • Testing in testlab (Fall 2009)
  • Build PREX target ladder
  • GEM detectors
    • Needed for high-rate <math>Q^2</math> during PREX (Nilanga, Kent, KK)
    • Needs design of frontend electronics and DAQ (Nilanga, Kent, KK, Bob)


LINKS

Bob Michaels work list for HAPPEx III, PVDIS and PREX