Transversity/Online HowTo
From Hall A Wiki
Here is shift index page of worker HowTo for experiment transversity.
General
- Data Replay
- Experts On-Call
- Database: http://hallaweb.jlab.org/experiment/transversity/rundb/db_halla_wei/
Detectors
- High Voltage GUI for BigBite (Wire Chamber, Scintillator and Shower)
- Change Wire Chamber Threshold
- How to set BigBite Total Shower thresholds
- BigBite Wire Chamber Trip Recover Procedure
- How to reboot TS12 ROC5-10
- RICH pedestal run
Polarized He3 Target
- Target Operator Check List
- Spin Flip System
- Holding Field Control
- Target Slow Control
- NMR Measurement
- Oven Control
- Special Procedure For Moving Target
Run sheets and shift checklist
Commissioning run sheet ps file and tex file
Production run sheet ps file and tex file
Production beam charge accumulation sheet ps file