G2p shifts

From Hall A Wiki
Revision as of 13:22, 12 March 2012 by Slifer (Talk | contribs) (Notes)

Jump to: navigation, search

Information for Shift Workers

Useful Links

Notes

  • Ask for beam off when modifying Septa Current or inserting/removing target.
  • Change Septa in less than 50 A increments. Keep left and right matched when beam is on.
  • Coda configuration: LHRSHAP, RHRSBUFF
  • Log VDC efficiencies at least once per shift.
  • Hall A current : Open Monticello / Wall / Hall A GUI, and look at the 1H00 BCM.
  • For Hall A tools screen, on hacuser type "NewTools" which pops up EOSMenu. Select "HLAmain".
  • For Stripchart, click toolbox on bottom of desktop menu
  • Keep a stripchart running of the septa currents.
  • Note: There is *always* one transitor fault on the right septa (bigbite powersupply).
  • Note: IHWP1 flips the beam helicity. IHWP2 is passive (actually a full wave plate) and will not flip the helicity. The status of both should be recorded. The epics var for IHWP2 is IGL1I00DIOFLRD :13056 means the passive wave-plate is in. 8960 is out..