Docs
From Hall A Wiki
Revision as of 15:35, 8 February 2021 by Rmontgom (Talk | contribs) (→Manuals/Spec sheets for component:)
Contents
General Documents:
- BigBite Timing hodoscope Technical Specifications (design and performance requirements), J. Annand et al. [[1]]
- Software requirements, R. Montgomery et al. [[2]]
- High voltage and low voltage set up and operation for hodoscope in TEDf with cosmics, J. Annand et al. [[3]]
- Original electronics plan (describes chain from PMT to final VME readout, including high voltage and low voltage)[[4]]
- Scintillator bar and light guide surface roughening tests in Glasgow 2020, R. Montgomery et al. [[5]]
Mapping Documents:
- Updated mapping for cosmics running 2021 currently in preparation
- High voltage and low voltage mapping up to Feb 2019 description (layout OUTDATED, will remove when new mapping uploaded) [[6]]
- Accompanying high voltage and low voltage mapping up to Feb 2019 excel sheet (layout OUTDATED, will remove when new mapping uploaded) [[7]]
Schematics:
- HV patch panels, J. Annand, A. Clarkson [[8]]
- Schematic for LV distributor panel is found in figure 5 of "Original electronics plan" document listed in general documents above
- Schematic for PMT bases is found in figure 3 of "Original electronics plan" document listed in general documents above
- Schematic of NINO front end cards is found in figure 4 of "Original electronics plan" document listed in general documents above
Manuals/Spec sheets for component:
- Electron Tubes ET9124 SB PMTs
- Eljen EJ200 Scintillator bars [[9]]
- HV connectors at HV patch panel end [[10]]
- DYMAX optical cure epoxy - check which model was used in Jlab repairs
- CAEN V792 [[11]]
- CAEN V1190 [[12]]
- CAEN SY1527LC mainframe [[13]]
- CAEN A1932A HV distributer modules
- AGILENT N5761A DC power supply unit [[14]]
- Wiener VME64x6023 crate