D2n Talks/Reports
From Hall A Wiki
Contents
- 1 How to connect to a d2n VNC Session
- 2 Earlier Collaboration Meetings
- 3 Add progress reports below.
- 3.1 17 April 2009 Phone meeting:
- 3.2 12 May 2009 Phone Meeting:
- 3.3 22 May 2009 Transversity Collaboration Meeting:
- 3.4 26 May 2009 Phone Meeting:
- 3.5 11 June 2009 Meeting:
- 3.6 23 June 2009 Meeting:
- 3.7 07 July 2009 Meeting:
- 3.8 21 July 2009 Meeting:
- 3.9 24 July 2009 Transversity Collaboration Meeting:
How to connect to a d2n VNC Session
Earlier Collaboration Meetings
Add progress reports below.
17 April 2009 Phone meeting:
- Notes: d2n_meeting-17Apr2009.txt
12 May 2009 Phone Meeting:
- Progress Reports:
- Matt Posik: BB Cerenkov gain Media:BBcer_1pe_gain.pdf
- David Flay: LHRS Pion Rejector Calibration Media:Prl_5_12_09.pdf
22 May 2009 Transversity Collaboration Meeting:
- Progress Reports:
- BigBite Optics Media:BB_Optics-Xin.pdf
- Analysis block diagram (Jiang) Media:transn_collaboration_meet_052209-Jiang.pdf
- Target Water NMR Analysis (Yi Zhang) Media:Target_Water_NMR-ZhangYi.pdf
- LHRS Calibrations (Dutta) Media:LRHS_Calib-Dutta.pdf
- Coincidence Timing and Farm Production Media:Coin_Timing_and_Farm_Production-Huang.pdf
- BigBite Shower, Scaler, and Beamline Calib Media:BB_Shower_Scaler_Beamline_Calib-Allada.pdf
26 May 2009 Phone Meeting:
- Progress Reports:
- Diana Parno: Compton analysis Media:Parno_26May09.pdf
- Matt Posik: BB Cerenkov Analysis Media:cer_tdc.pdf
- David Flay: LHRS Calibration Analysis Media:DF_prl_5_26_09_edit.pdf (edited on 6/25/09 to reflect updated values of 1 p.e. pos. in LHRS Gas Cerenkov)
11 June 2009 Meeting:
- Progress Reports:
- Diana Parno: Special runs and Compton rate cuts Media:Parno11Jun09.pdf
23 June 2009 Meeting:
- Progress Reports:
- Matt Posik: Big Bite Cerenkov Analysis Media:BB_cer_06_23_09.pdf
- David Flay: LHRS Pion Rejector Analysis Media:DF_LHRS_6_23_09.pdf
- Diana Parno: Compton Analysis Media:Parno_23Jun09.pdf
07 July 2009 Meeting:
- Progress Reports:
- David Flay: LHRS Pion Rejector Analysis Media:DF_LHRS_7_7_09.pdf
- Diana Parno: Compton Analysis Media:Parno_07Jul09.pdf
21 July 2009 Meeting:
- Progress Reports:
- David Flay: LHRS Pion Rejector Analysis Media:DF_LHRS_7_21_09.pdf
- Diana Parno: Compton Analysis Media:Parno_21Jul09.pdf
24 July 2009 Transversity Collaboration Meeting:
I strongly encourage you to attend ths meeting.