Transversity Collaboration Meeting

(July 09th, 2007 at JLab L224)

 9:00-9:15    CEBAF accelerator status and 6 GeV operation -- Larry Cardman

 9:15-9:30    Hall A status and schedule -- Kees de Jager

 9:30-9:50    Progresses and milestone check -- Xiaodong Jiang (.pdf)

 9:50-10:05    Discussions.

 10:05-10:15    RICH detector update -- Evaristo Cisbani (.pdf)

 10:15-10:25    HRS Aerogel A1 update -- Pete Markowitz (Xiaodong)

 10:25-10:35    HRS S2M detector status -- Vince Sulkosky

 10:35-10:45     --Short break--

 10:45-11:05    BigBite wire chamber1+chamber3 test,and preparations for chamber-2 test -- Xin Qian (.pdf)

 11:05-11:15    Chamber-2 work at UVa.: discussions on chamber-2 work and chamber-1 repair -- Nilanga Liyanage

 11:15-11:45    Gas Cherenkov hardware progress -- Brad Sawatzky (.pdf)

 11:45-12:05    Trigger, DAQ and FASTBUS readout test -- Kalyan Allada (.pdf)

 12:05-12:30    Progress on tracking software -- Ole Hansen (.pdf)

 12:30-13:30    --Lunch break--

 13:30-13:50    BigBite shower and preshower detector progress -- Albert Shahinyan

 13:50-14:10    Status of wire chamber preAmp cards, and discussion on hardware design progress -- Doug Higinbotham

 14:10-14:30   A list of summer hardware work in the Hall, and discussions -- Xiaodong Jiang

 14:30-15:00    Polarized target design progress -- Al Gavalya

 15:00-15:20   BigBite design progress -- Al Gavalya

 15:20-15:30   --Short break--

 15:30-15:50   Progress on JLab target Lab -- Chiranjib Dutta (.pdf)

 15:50-16:10   W&M target lab progress and cell production -- Joe Katich/(Todd Averett) (.pdf)

 16:10-16:30   Systematic control, scheme of target spin-flip.-- Yi Qiang (.pdf)

 16:30-16:50   Systematic control, luminosity monitors and HAPPEX-feed back. -- Tim Holmstrom

 16:50-17:20   Discussion on work-schedule/manpower/responsibilities.

 17:30    Adjourn