Difference between revisions of "Docs"

From Hall A Wiki
Jump to: navigation, search
(Manuals/Spec sheets for components of hodoscope)
(Specific Fall Run 2021 Items)
 
(45 intermediate revisions by 2 users not shown)
Line 1: Line 1:
 +
===Specific Fall Run 2021 Items===
 +
*High Voltage Mapping. This is a pdf of the excel spreadsheet passed to epics. Contact Ralph Marinaro, Steve Wood or Rachel Montgomery for the actual spreadsheet. [[https://hallaweb.jlab.org/wiki/images/0/0a/HodoMapping_Aug2021.pdf]]
 +
*High and low voltage how to for shifters. [[https://hallaweb.jlab.org/wiki/images/6/6a/Hodo_HowTo.pdf]]
 +
*Analysis how to for shifters [[http://nuclear.gla.ac.uk/~rachel/BBTH_HowTo_Analysis.pdf]]
 +
*High and low voltage how to for shifters after tedbbdaq failure (jan 2022). [[https://hallaweb.jlab.org/wiki/images/7/73/Hodo_HowTo_Jan2022.pdf]]
 +
 +
===Expert and General How to Documents===
 +
*High voltage and low voltage set up and operation for hodoscope in TEDf with cosmics, including EPICS instructions [[https://hallaweb.jlab.org/wiki/images/7/70/BBelect_EpicsUpdateApr32021.pdf]]
 +
 +
===Software===
 +
* SBSTimingHodoscope class which is under continuous development can be cloned from : https://github.com/rachel-m/SBS-offline.git on the branch BB_TH_dev
 +
* Analysis and calibration macros, which are also under continuous development, can be found on the main branch at: https://github.com/rachel-m/HodoSW
 +
* [https://hallaweb.jlab.org/wiki/images/0/0f/README_TH_SBSOffline.pdf Document about SBS-offline for the hodoscope.] The pdf and .docx files are also found on the [https://github.com/rachel-m/HodoSW github]. If you add anything relevent to the TH class in SBS-offline please update the docx and pdf files, here and on the git hub.
 +
* [https://hallaweb.jlab.org/wiki/images/2/2a/README_TH_CalibrationMacros.pdf Document about the calibration scripts.] The pdf and .docx files are also found on the [https://github.com/rachel-m/HodoSW github]. If you add anything to the calibration macros please update the docx and pdf files on this page and the git hub.
 +
* [https://hallaweb.jlab.org/wiki/images/2/2e/README_TH_OnlineDisplay.pdf Document about the online display for shift workers.] The pdf and .docx files are also found on the [https://github.com/rachel-m/HodoSW github]. If you add anything to the online display and shift worker code please update the docx and pdf files on this page and the git hub.
 +
 
===General Documents===
 
===General Documents===
 
*BigBite Timing hodoscope Technical Specifications (design and performance requirements), J. Annand et al. [[https://hallaweb.jlab.org/wiki/images/f/fb/BB-Hodo-technical-specs.pdf]]
 
*BigBite Timing hodoscope Technical Specifications (design and performance requirements), J. Annand et al. [[https://hallaweb.jlab.org/wiki/images/f/fb/BB-Hodo-technical-specs.pdf]]
 
*Software requirements, R. Montgomery et al. [[https://hallaweb.jlab.org/wiki/images/1/1e/BB_TH_Software_Requirements.pdf]]
 
*Software requirements, R. Montgomery et al. [[https://hallaweb.jlab.org/wiki/images/1/1e/BB_TH_Software_Requirements.pdf]]
*High voltage and low voltage set up and operation for hodoscope in TEDf with cosmics, J. Annand et al. [[https://hallaweb.jlab.org/wiki/images/7/7f/BBLVHV.pdf]]
+
*Original electronics plan, J. Annand et al. (describes chain from PMT to final VME readout, including high voltage and low voltage)[[https://hallaweb.jlab.org/wiki/images/e/e6/BBhodoElect.pdf]]
*Original electronics plan (describes chain from PMT to final VME readout, including high voltage and low voltage)[[https://hallaweb.jlab.org/wiki/images/e/e0/BBelect.17.07.19.pdf]]
+
 
*Scintillator bar and light guide surface roughening tests in Glasgow 2020, R. Montgomery et al. [[https://hallaweb.jlab.org/wiki/images/b/ba/Roughening_Glueing_May2020.pdf]]
 
*Scintillator bar and light guide surface roughening tests in Glasgow 2020, R. Montgomery et al. [[https://hallaweb.jlab.org/wiki/images/b/ba/Roughening_Glueing_May2020.pdf]]
  
 
===Mapping Documents===
 
===Mapping Documents===
*Updated mapping for cosmics running 2021 '''currently in preparation'''
+
*Updated complete mapping for cosmics running 2021 (G. Penman, May 2021 during cosmic comissioning)  [[https://hallaweb.jlab.org/wiki/images/f/fc/BB_Hodoscope_Overview_Mapping.pdf]]
*High voltage and low voltage mapping up to Feb 2019 description (layout OUTDATED, will remove when new mapping uploaded) [[https://hallaweb.jlab.org/wiki/images/8/8f/HodoMapping_Feb2020_lowres.pdf]]
+
*Updated cosmics mapping spreadsheet (R. Marinaro, G. Penman, May 2021) [[https://hallaweb.jlab.org/wiki/images/b/b8/HodoMapping_May2021.xlsx]]
*Accompanying high voltage and low voltage mapping up to Feb 2019 excel sheet (layout OUTDATED, will remove when new mapping uploaded) [[https://hallaweb.jlab.org/wiki/images/a/ad/HodoMapping_Feb2020.xlsx]]
+
*Cosmics channel mapping (R. Marinaro, May 2021 during cosmic commissioning) [[https://hallaweb.jlab.org/wiki/images/0/0c/BB_HODO_Channel_Map.pdf]]
  
 
===Schematics===
 
===Schematics===
 
*HV patch panels, J. Annand, A. Clarkson [[https://hallaweb.jlab.org/wiki/images/2/24/HVpanel.pdf]]
 
*HV patch panels, J. Annand, A. Clarkson [[https://hallaweb.jlab.org/wiki/images/2/24/HVpanel.pdf]]
*Schematic for LV distributor panel is found in figure 5 of "Original electronics plan" document listed in general documents above
+
*Schematic for LV distributor panel is found in figure 5 of "Original electronics plan" document [[https://hallaweb.jlab.org/wiki/images/e/e6/BBhodoElect.pdf]]
*Schematic for PMT bases is found in figure 3 of "Original electronics plan" document listed in general documents above
+
*Schematic for PMT bases is found in figure 3 of "Original electronics plan" document [[https://hallaweb.jlab.org/wiki/images/e/e6/BBhodoElect.pdf]]
*Schematic of NINO front end cards is found in figure 4 of "Original electronics plan" document listed in general documents above
+
*Schematic of NINO front end cards is found in figure 4 of "Original electronics plan" document [[https://hallaweb.jlab.org/wiki/images/e/e6/BBhodoElect.pdf]]
  
 
===Manuals/Spec sheets for components of hodoscope===
 
===Manuals/Spec sheets for components of hodoscope===
Line 25: Line 40:
 
*CAEN V792 [[https://hallaweb.jlab.org/wiki/images/a/a1/V792_rev18.pdf]]
 
*CAEN V792 [[https://hallaweb.jlab.org/wiki/images/a/a1/V792_rev18.pdf]]
 
*CAEN V1190 [[https://hallaweb.jlab.org/wiki/images/2/21/V1190_REV14.pdf]]
 
*CAEN V1190 [[https://hallaweb.jlab.org/wiki/images/2/21/V1190_REV14.pdf]]
*CAEN SY1527LC HV mainframe [[https://hallaweb.jlab.org/wiki/images/5/58/Sy1527usermanual_rev18.pdf]]
+
*CAEN SY1527LC HV mainframe, 19" wide, 8U [[https://hallaweb.jlab.org/wiki/images/5/58/Sy1527usermanual_rev18.pdf]]
*CAEN A1932A HV distributer modules - these manuals on CAEN website are corrupted - investigating
+
*Accessory CAEN A1932AN 48 channel HV distributer modules for mainframe [[https://hallaweb.jlab.org/wiki/images/5/55/A1932a_rev9-3.pdf]]
*AGILENT N5761A DC power supply unit for NINO front end cards [[https://hallaweb.jlab.org/wiki/images/1/17/N5700usr-2.pdf]]
+
*Accessory CAEN A1531 primary PSU for HV mainframe - no specific manual online, contacted CAEN and they refer to this document [[https://hallaweb.jlab.org/wiki/images/9/92/Hwguide_rev3.pdf]]
*Wiener VME64x6023 crate
+
*AGILENT N5761A DC power supply unit for NINO front end cards, 19" wide, 1U, rack-mountable [[https://hallaweb.jlab.org/wiki/images/1/17/N5700usr-2.pdf]]
 +
*Wiener 6U VME64x 6023 crate [[https://hallaweb.jlab.org/wiki/images/c/cd/6U_VME64x_6023_Full_Size_Chassis_-_VME64-x.pdf]]
 +
 
 +
===Outdated/Preliminary Mapping Below (Just stored here for reference, do not use as of Jan 2021 onwards)===
 +
*Cosmics high voltage and low voltage mapping overview (R. Montgomery, February 2020) [[https://hallaweb.jlab.org/wiki/images/8/8f/HodoMapping_Feb2020_lowres.pdf]]
 +
*Cosmics mapping spreadsheet document, take note there are 3 tabs in the spreadsheet. This mapping misses only signal cables from frame to weldment (R. Montgomery, Feb 2020). [[https://hallaweb.jlab.org/wiki/images/a/ad/HodoMapping_Feb2020.xlsx]]

Latest revision as of 12:16, 24 January 2022

Specific Fall Run 2021 Items

  • High Voltage Mapping. This is a pdf of the excel spreadsheet passed to epics. Contact Ralph Marinaro, Steve Wood or Rachel Montgomery for the actual spreadsheet. [[1]]
  • High and low voltage how to for shifters. [[2]]
  • Analysis how to for shifters [[3]]
  • High and low voltage how to for shifters after tedbbdaq failure (jan 2022). [[4]]

Expert and General How to Documents

  • High voltage and low voltage set up and operation for hodoscope in TEDf with cosmics, including EPICS instructions [[5]]

Software

General Documents

  • BigBite Timing hodoscope Technical Specifications (design and performance requirements), J. Annand et al. [[6]]
  • Software requirements, R. Montgomery et al. [[7]]
  • Original electronics plan, J. Annand et al. (describes chain from PMT to final VME readout, including high voltage and low voltage)[[8]]
  • Scintillator bar and light guide surface roughening tests in Glasgow 2020, R. Montgomery et al. [[9]]

Mapping Documents

  • Updated complete mapping for cosmics running 2021 (G. Penman, May 2021 during cosmic comissioning) [[10]]
  • Updated cosmics mapping spreadsheet (R. Marinaro, G. Penman, May 2021) [[11]]
  • Cosmics channel mapping (R. Marinaro, May 2021 during cosmic commissioning) [[12]]

Schematics

  • HV patch panels, J. Annand, A. Clarkson [[13]]
  • Schematic for LV distributor panel is found in figure 5 of "Original electronics plan" document [[14]]
  • Schematic for PMT bases is found in figure 3 of "Original electronics plan" document [[15]]
  • Schematic of NINO front end cards is found in figure 4 of "Original electronics plan" document [[16]]

Manuals/Spec sheets for components of hodoscope

  • Electron Tubes ET9124 SB type PMTs [[17]]
  • Eljen Technology EJ200 scintillator bars [[18]]
  • Eljen technology UVT acrylic light guides [[19]]
  • DYMAX optical cure epoxy - check which specific model number was used in Jlab repairs
  • Cage HV connectors at HV patch panel connections [[20]]
  • CAEN V792 [[21]]
  • CAEN V1190 [[22]]
  • CAEN SY1527LC HV mainframe, 19" wide, 8U [[23]]
  • Accessory CAEN A1932AN 48 channel HV distributer modules for mainframe [[24]]
  • Accessory CAEN A1531 primary PSU for HV mainframe - no specific manual online, contacted CAEN and they refer to this document [[25]]
  • AGILENT N5761A DC power supply unit for NINO front end cards, 19" wide, 1U, rack-mountable [[26]]
  • Wiener 6U VME64x 6023 crate [[27]]

Outdated/Preliminary Mapping Below (Just stored here for reference, do not use as of Jan 2021 onwards)

  • Cosmics high voltage and low voltage mapping overview (R. Montgomery, February 2020) [[28]]
  • Cosmics mapping spreadsheet document, take note there are 3 tabs in the spreadsheet. This mapping misses only signal cables from frame to weldment (R. Montgomery, Feb 2020). [[29]]