Difference between revisions of "Transversity/Online HowTo"
From Hall A Wiki
(→Polarized He3 Target) |
|||
(31 intermediate revisions by 10 users not shown) | |||
Line 1: | Line 1: | ||
− | Here is shift index page of | + | Here is shift index page of worker HowTo for experiment [[transversity]]. |
− | * [[Transversity/Online Replay|Replay | + | == General == |
− | + | ||
+ | * [[Transversity/Online Replay|Data Replay]] | ||
* [[Experts On-Call]] | * [[Experts On-Call]] | ||
− | * [[ | + | * Database: http://hallaweb.jlab.org/experiment/transversity/rundb/db_halla_wei/ |
− | + | ||
− | + | == Detectors == | |
− | + | * [[BigBite HV GUI]] (updated 23 April 2009) | |
− | + | * [[High Voltage GUI for BigBite (Wire Chamber, Scintillator and Shower)]] | |
− | + | * [[Change Wire Chamber Threshold]] | |
− | + | * [[Recover after BigBite CAMAC reset]] | |
− | + | * [[How to set BigBite Total Shower thresholds]] | |
− | + | * [[BigBite Wire Chamber Trip Recover Procedure]] | |
− | + | * [http://hallaweb.jlab.org/wiki/index.php/BigBite/RemoteCrateReset How to reboot TS12 ROC5-10 ] | |
− | + | * [[RICH pedestal run]] | |
− | + | * [[Scaler problem]] ''or'' "Scaler problem: Please check the web page" | |
− | + | * [[How to calibrate shower and preshower with cosmics]] | |
− | + | * [[Neutron Detector]] | |
− | + | ||
− | + | == Polarized He3 Target == | |
− | + | ||
− | + | * [[Target Operator Check List]] | |
− | + | * [[Spin Flip/Shift Worker Quick Start|Spin Flip System]] | |
+ | * [[Holding Field Control]] | ||
+ | * [[Target Slow Control]] | ||
+ | * [[NMR Measurement]] | ||
+ | * [[Oven Control]] | ||
+ | * [[Special Procedure For Moving Target]] | ||
+ | * [[Beam Recovery Procedure]] | ||
+ | |||
+ | == Run sheets and shift checklist == | ||
+ | |||
+ | Commissioning run sheet | ||
+ | [http://hallaweb.jlab.org/experiment/transversity/wikifile/Run-Sheet-Commissioning.ps ps file] and | ||
+ | [http://hallaweb.jlab.org/experiment/transversity/wikifile/Run-Sheet-Commissioning.tex tex file] | ||
+ | |||
+ | Production run sheet | ||
+ | [http://hallaweb.jlab.org/experiment/transversity/wikifile/Run-Sheet-production.ps ps file] and | ||
+ | [http://hallaweb.jlab.org/experiment/transversity/wikifile/Run-Sheet-production.tex tex file] | ||
+ | |||
+ | Production beam charge accumulation sheet | ||
+ | [http://hallaweb.jlab.org/experiment/transversity/wikifile/E06010_beam_charge_sheet.ps ps file] | ||
+ | |||
+ | Shift checklist | ||
+ | [http://hallaweb.jlab.org/experiment/transversity/wikifile/shift-check-list.ps ps file] and | ||
+ | [http://hallaweb.jlab.org/experiment/transversity/wikifile/shift-check-list.tex tex file] |
Latest revision as of 15:08, 6 May 2009
Here is shift index page of worker HowTo for experiment transversity.
General
- Data Replay
- Experts On-Call
- Database: http://hallaweb.jlab.org/experiment/transversity/rundb/db_halla_wei/
Detectors
- BigBite HV GUI (updated 23 April 2009)
- High Voltage GUI for BigBite (Wire Chamber, Scintillator and Shower)
- Change Wire Chamber Threshold
- Recover after BigBite CAMAC reset
- How to set BigBite Total Shower thresholds
- BigBite Wire Chamber Trip Recover Procedure
- How to reboot TS12 ROC5-10
- RICH pedestal run
- Scaler problem or "Scaler problem: Please check the web page"
- How to calibrate shower and preshower with cosmics
- Neutron Detector
Polarized He3 Target
- Target Operator Check List
- Spin Flip System
- Holding Field Control
- Target Slow Control
- NMR Measurement
- Oven Control
- Special Procedure For Moving Target
- Beam Recovery Procedure
Run sheets and shift checklist
Commissioning run sheet ps file and tex file
Production run sheet ps file and tex file
Production beam charge accumulation sheet ps file