Difference between revisions of "Transversity/Online HowTo"

From Hall A Wiki
Jump to: navigation, search
(Polarized He3 Target)
 
(33 intermediate revisions by 10 users not shown)
Line 1: Line 1:
Here is shift index page of workder HowTo for experiment [[transversity]].
+
Here is shift index page of worker HowTo for experiment [[transversity]].
  
* [[Transversity/Online Replay|Replay]]
+
== General ==
* [[Spin Flip/Shift Worker Quick Start|Spin Flip System]]
+
 
 +
* [[Transversity/Online Replay|Data Replay]]
 
* [[Experts On-Call]]
 
* [[Experts On-Call]]
* [[Turn On High Voltage GUI for BigBite]]
+
* Database: http://hallaweb.jlab.org/experiment/transversity/rundb/db_halla_wei/
    Log in adev@adaql3 (Please log in adaql3) <br>
+
 
    run "hvgui" <br>
+
== Detectors ==
* [[Turn on High Voltage on Wire Chamber]]
+
* [[BigBite HV GUI]] (updated 23 April 2009)
* [[Turn off High Voltage on Wire Chamber]]
+
* [[High Voltage GUI for BigBite (Wire Chamber, Scintillator and Shower)]]
* [[Adjust High Voltage for Wire Chamber]]
+
* [[Change Wire Chamber Threshold]]
 +
* [[Recover after BigBite CAMAC reset]]
 +
* [[How to set BigBite Total Shower thresholds]]
 +
* [[BigBite Wire Chamber Trip Recover Procedure]]
 +
* [http://hallaweb.jlab.org/wiki/index.php/BigBite/RemoteCrateReset How to reboot TS12 ROC5-10 ]
 +
* [[RICH pedestal run]]
 +
* [[Scaler problem]] ''or'' "Scaler problem: Please check the web page"
 +
* [[How to calibrate shower and preshower with cosmics]]
 +
* [[Neutron Detector]]
 +
 
 +
== Polarized He3 Target ==
 +
 
 +
* [[Target Operator Check List]]
 +
* [[Spin Flip/Shift Worker Quick Start|Spin Flip System]]
 +
* [[Holding Field Control]]
 +
* [[Target Slow Control]]
 +
* [[NMR Measurement]]
 +
* [[Oven Control]]
 +
* [[Special Procedure For Moving Target]]
 +
* [[Beam Recovery Procedure]]
 +
 
 +
== Run sheets and shift checklist ==
 +
 
 +
Commissioning run sheet
 +
[http://hallaweb.jlab.org/experiment/transversity/wikifile/Run-Sheet-Commissioning.ps ps file] and
 +
[http://hallaweb.jlab.org/experiment/transversity/wikifile/Run-Sheet-Commissioning.tex tex file]
 +
 
 +
Production run sheet
 +
[http://hallaweb.jlab.org/experiment/transversity/wikifile/Run-Sheet-production.ps ps file] and
 +
[http://hallaweb.jlab.org/experiment/transversity/wikifile/Run-Sheet-production.tex tex file]
 +
 
 +
Production beam charge accumulation sheet
 +
[http://hallaweb.jlab.org/experiment/transversity/wikifile/E06010_beam_charge_sheet.ps ps file]
 +
 
 +
Shift checklist
 +
[http://hallaweb.jlab.org/experiment/transversity/wikifile/shift-check-list.ps ps file] and
 +
[http://hallaweb.jlab.org/experiment/transversity/wikifile/shift-check-list.tex tex file]

Latest revision as of 15:08, 6 May 2009

Here is shift index page of worker HowTo for experiment transversity.

General

Detectors

Polarized He3 Target

Run sheets and shift checklist

Commissioning run sheet ps file and tex file

Production run sheet ps file and tex file

Production beam charge accumulation sheet ps file

Shift checklist ps file and tex file