Difference between revisions of "G2p shifts"

From Hall A Wiki
Jump to: navigation, search
(Basic Resources for Shift Workers)
Line 1: Line 1:
 
<B>This page is updated frequently.  Please hit Reload at least once per shift.</B>
 
<B>This page is updated frequently.  Please hit Reload at least once per shift.</B>
 
==Basic Resources for Shift Workers==
 
==Basic Resources for Shift Workers==
* Links: [http://hallaweb.jlab.org/halog/log/html/logdir.html (Halog)] [http://hallaweb.jlab.org/experiment/g2p/target/ (tlog)][https://hallaweb.jlab.org/wiki/index.php/G2p (g2pwiki)] [https://misportal.jlab.org/mis/physics/shiftschedule/index.cfm?experimentRunId=G2PGEP (ShiftSchedule)] [https://userweb.jlab.org/~brads/mcc/ (MCC)]  [https://bta/ (bta)] [http://hallaweb.jlab.org/experiment/g2p/runsum/output/l.html (LSummary)] [http://hallaweb.jlab.org/experiment/g2p/runsum/output/l.html (RSummary)]
+
* Today's  g2p [http://hallaweb.jlab.org/experiment/g2p/shifts/today runplan]
* Today's  [http://hallaweb.jlab.org/experiment/g2p/shifts/today runplan]
+
* Logs: [http://hallaweb.jlab.org/halog/log/html/logdir.html Halog] and [http://hallaweb.jlab.org/experiment/g2p/target/ Target log]
* Expert contact [https://hallaweb.jlab.org/wiki/index.php/G2pcontacts list] and Expert [https://hallaweb.jlab.org/wiki/index.php/G2p_Expert_Shifts Shifts]
+
* Run Summary Tables: [http://hallaweb.jlab.org/experiment/g2p/runsum/output/l.html (Left Arm)] [http://hallaweb.jlab.org/experiment/g2p/runsum/output/l.html (Right Arm)] [http://hallaweb.jlab.org/experiment/g2p/runsum/output/3.html (3rd arm)]
* Run Sheets ([http://hallaweb.jlab.org/experiment/g2p/shifts/Run-Sheet_g2p_B.pdf pdf]) and Shift [http://hallaweb.jlab.org/experiment/g2p/shifts/shift-check-list.pdf checklist]
+
* Beamtime accounting: [https://bta/ bta]  
 +
* Expert contact [https://hallaweb.jlab.org/wiki/index.php/G2pcontacts list] and the [https://misportal.jlab.org/mis/physics/shiftschedule/index.cfm?experimentRunId=G2PGEP ShiftSchedule]
 +
* Run Sheets ([http://hallaweb.jlab.org/experiment/g2p/shifts/Run-Sheet_g2p_B.pdf pdf]) and Shift Checklist ([http://hallaweb.jlab.org/experiment/g2p/shifts/shift-check-list.pdf pdf])
 +
* MCC [https://userweb.jlab.org/~brads/mcc/ Whiteboard]
 +
* Return to the [https://hallaweb.jlab.org/wiki/index.php/G2p g2pwiki]
  
 
==Shift Instructions ==
 
==Shift Instructions ==

Revision as of 13:24, 19 April 2012

This page is updated frequently. Please hit Reload at least once per shift.

Basic Resources for Shift Workers

Shift Instructions

  • The septa current must be set to match each new spectrometer dipole momentum setting.
  • Make sure to acknowledge the DAQ popup messages for Start and End of every run.
  • Keep a stripchart running of the septa currents. Log any fluctuations, and notify Run Coordinator.
  • Take bleedthru measurement once a shift
  • Make sure you know exactly what you are doing if operating the Sieve Slit. Compare to this photo

How Tos


Useful Links

Miscellaneous Notes

  • The Coda configuration is: LHRS, RHRS
  • To read the Hall A current : Open Monticello / Wall / Hall A GUI, and look at the 1H00 BCM.
  • To open the Hall A tools screen, as hacuser type "NewTools" which pops up EOSMenu. Select "HLAmain".
  • To start a Stripchart, click toolbox on bottom of desktop menu
  • Only IHWP1 flips the beam helicity. IHWP2 is passive.