Difference between revisions of "G2p shifts"

From Hall A Wiki
Jump to: navigation, search
(How Tos)
(How Tos)
 
Line 18: Line 18:
 
* How to [http://hallaweb.jlab.org/halog/log/html/1204_archive/120409230744.html make vertical correction to target insert]
 
* How to [http://hallaweb.jlab.org/halog/log/html/1204_archive/120409230744.html make vertical correction to target insert]
 
* [[ How to take HARP scan ]]
 
* [[ How to take HARP scan ]]
* <s>How to recover the beam after an extended (>4 hour) down: [[G2p-beam-recovery]]  </s>
 
 
* [[ How to recover BPM positions after a long beam trip or tune change]]
 
* [[ How to recover BPM positions after a long beam trip or tune change]]
 
* How to [http://hallaweb.jlab.org/halog/log/html/1203_archive/120312165203.html check Bleed-thru]
 
* How to [http://hallaweb.jlab.org/halog/log/html/1203_archive/120312165203.html check Bleed-thru]

Latest revision as of 10:10, 9 May 2012

This page is updated frequently. Please hit Reload at least once per shift.

Basic Resources for Shift Workers

How Tos

Useful Links

Miscellaneous Notes

  • The Coda configuration is: LHRS, RHRS
  • To read the Hall A current : Open Monticello / Wall / Hall A GUI, and look at the 1H00 BCM.
  • To open the Hall A tools screen, as hacuser type "NewTools" which pops up EOSMenu. Select "HLAmain".
  • To start a Stripchart, click toolbox on bottom of desktop menu
  • Only IHWP1 flips the beam helicity. IHWP2 is passive.