Difference between revisions of "Solid Calorimeter"

From Hall A Wiki
Jump to: navigation, search
Line 24: Line 24:
 
they show up at http://hallaweb.jlab.org/12GeV/SoLID/download/ec/
 
they show up at http://hallaweb.jlab.org/12GeV/SoLID/download/ec/
  
= [[Solid EC To Do | to do list (click to open a new page)]]=
+
= Dimension and Layout =
 +
 
 +
* limitation
 +
  Fluxreturn space radius 90 - 270cm
 +
  crystat radius 0 - 144cm
 +
 
 +
* dimension
 +
  PVDIS FAEC radius 96 - 262cm
 +
  SIDIS FAEC radius 96 - 262cm
 +
  SIDIS LAEC radius 92 - 140cm
 +
 
 +
* note
 +
** 1. the inner radius of fluxreturn could be reduced to 85cm
 +
Please note
 +
1. The radius for LAEC and FAEC are just the range of minimum acceptance we want to cover. The actual physical size can be larger, but it's limited by available spaces.
 +
2. the FAEC supporting structure is share between SIDIS and PVDIS experiments. While SIDIS needs from 96cm - 230cm and PVDIS needs 110cm - 262cm, the overall need is 96 - 262cm.
 +
3. SIDIS FAEC needs to move upsteam 85cm to become PVDIS FAEC, so the supporting structure needs to allow the movement. Note at the before and after locations, the endcap nose shape changes. It's a concern if the supporting structure is connected to the endcap nose. If the supporting is only connected to the endcap donut (15cm thick iron), not the endcap nose, it won't be a concern any more.
 +
4. LAEC needs to support on its own without putting force on cryostat and its supporting may need to share with GEM to stay within the limited space inside the solenoid.
 +
5. The LAEC 92cm is the limit for the 100cm2 size module only. Below that, we need to put in smaller size modules to fill the triangle area as much as possible, but not cross the hypotenuse line at 14.85 degree.
 +
 
 +
 
 +
**********************************
 +
 
 +
= [[Solid EC To Do | todo list (2012/06) (click to open a new page)]]=
  
 
= [[solid calorimeter fiber and connector | fiber and connector]]=
 
= [[solid calorimeter fiber and connector | fiber and connector]]=

Revision as of 21:52, 3 June 2013

info

meeting

 Agendas and Minutes of weekly meeting
time: Tuesday 10:00PM
room: refer to meeting minutes page
phoneline: (US 866-740-1260 International 303-248-0285 Access code: 8206694)
remote desktop sharing: http://www.readytalk.com/, join as a PARTICIPANT with the same access code as phoneline

Email list

"solid_ec at jlab.org" registration and archive

the administrator is Zhiwen Zhao (zwzhao at jlab.org)

file dir

link in dropbox

https://www.dropbox.com/sh/365le2o93vpn14e/4DLnKV_lN-

upload files to /u/group/halla/www/hallaweb/html/12GeV/SoLID/download/ec

they show up at http://hallaweb.jlab.org/12GeV/SoLID/download/ec/

Dimension and Layout

  • limitation
 Fluxreturn space radius 90 - 270cm
 crystat radius 0 - 144cm
  • dimension
 PVDIS FAEC radius 96 - 262cm
 SIDIS FAEC radius 96 - 262cm
 SIDIS LAEC radius 92 - 140cm
  • note
    • 1. the inner radius of fluxreturn could be reduced to 85cm

Please note 1. The radius for LAEC and FAEC are just the range of minimum acceptance we want to cover. The actual physical size can be larger, but it's limited by available spaces. 2. the FAEC supporting structure is share between SIDIS and PVDIS experiments. While SIDIS needs from 96cm - 230cm and PVDIS needs 110cm - 262cm, the overall need is 96 - 262cm. 3. SIDIS FAEC needs to move upsteam 85cm to become PVDIS FAEC, so the supporting structure needs to allow the movement. Note at the before and after locations, the endcap nose shape changes. It's a concern if the supporting structure is connected to the endcap nose. If the supporting is only connected to the endcap donut (15cm thick iron), not the endcap nose, it won't be a concern any more. 4. LAEC needs to support on its own without putting force on cryostat and its supporting may need to share with GEM to stay within the limited space inside the solenoid. 5. The LAEC 92cm is the limit for the 100cm2 size module only. Below that, we need to put in smaller size modules to fill the triangle area as much as possible, but not cross the hypotenuse line at 14.85 degree.


todo list (2012/06) (click to open a new page)

fiber and connector

beam test (click to open another page)

talks and notes

2012_01_06 Jlab Physics Division Brain Storm Session by Xiaochao Zheng pdf

2011_12_09 meet with W&M and talk about general and beam test plan

2011_11_09 EC longitudinal segmentation option at weekly meeting

2011_10 collaboration meeting by Mehdi Meziane

2011_09_30 Jlab Physics Division Brain Storm Session by Jin Huang

2011_09_21 Update by Mehdi Meziane

2011_06 collaboration meeting by Zhiwen Zhao for forwardangle Calor

2011_06 collaboration meeting by Jin Huang for largeangle Calor

2011_03 collaboration meeting by Zhiwen Zhao for forwardangle Calor

2011_03 collaboration meeting by Jin Huang for largeangle Calor

previous pages (some info outdated)

Forward Calorimeter

Largeangle Calorimeter


Other ECAL

  • KOPIO

KOPIO NIM paper