Difference between revisions of "Docs"

From Hall A Wiki
Jump to: navigation, search
(Mapping Documents)
Line 10: Line 10:
 
===Mapping Documents===
 
===Mapping Documents===
 
*Updated mapping for cosmics running 2021 '''currently in preparation'''
 
*Updated mapping for cosmics running 2021 '''currently in preparation'''
*High voltage and low voltage mapping up to Feb 2020 description (will remove when new mapping uploaded) [[https://hallaweb.jlab.org/wiki/images/8/8f/HodoMapping_Feb2020_lowres.pdf]]
+
*Channel Mapping (February 2021) [[https://hallaweb.jlab.org/wiki/images/0/0c/BB_HODO_Channel_Map.pdf]]
*Accompanying Channel Map (February 2021) [[https://hallaweb.jlab.org/wiki/images/0/0c/BB_HODO_Channel_Map.pdf]]
+
*High voltage and low voltage mapping Feb 2020 description (will remove when new mapping uploaded) [[https://hallaweb.jlab.org/wiki/images/8/8f/HodoMapping_Feb2020_lowres.pdf]]
 +
*Full Mapping document Feb 2020, take not there are 3 tabs in the spreadsheet [[https://hallaweb.jlab.org/wiki/images/a/ad/HodoMapping_Feb2020.xlsx]]
  
 
===Schematics===
 
===Schematics===

Revision as of 14:24, 24 February 2021

General Documents

  • BigBite Timing hodoscope Technical Specifications (design and performance requirements), J. Annand et al. [[1]]
  • Software requirements, R. Montgomery et al. [[2]]
  • Original electronics plan, J. Annand et al. (describes chain from PMT to final VME readout, including high voltage and low voltage)[[3]]
  • Scintillator bar and light guide surface roughening tests in Glasgow 2020, R. Montgomery et al. [[4]]

How to Documents

  • High voltage and low voltage set up and operation for hodoscope in TEDf with cosmics, J. Annand et al. [[5]]

Mapping Documents

  • Updated mapping for cosmics running 2021 currently in preparation
  • Channel Mapping (February 2021) [[6]]
  • High voltage and low voltage mapping Feb 2020 description (will remove when new mapping uploaded) [[7]]
  • Full Mapping document Feb 2020, take not there are 3 tabs in the spreadsheet [[8]]

Schematics

  • HV patch panels, J. Annand, A. Clarkson [[9]]
  • Schematic for LV distributor panel is found in figure 5 of "Original electronics plan" document listed in general documents above
  • Schematic for PMT bases is found in figure 3 of "Original electronics plan" document listed in general documents above
  • Schematic of NINO front end cards is found in figure 4 of "Original electronics plan" document listed in general documents above

Manuals/Spec sheets for components of hodoscope

  • Electron Tubes ET9124 SB type PMTs [[10]]
  • Eljen Technology EJ200 scintillator bars [[11]]
  • Eljen technology UVT acrylic light guides [[12]]
  • DYMAX optical cure epoxy - check which specific model number was used in Jlab repairs
  • Cage HV connectors at HV patch panel connections [[13]]
  • CAEN V792 [[14]]
  • CAEN V1190 [[15]]
  • CAEN SY1527LC HV mainframe, 19" wide, 8U [[16]]
  • Accessory CAEN A1932AN 48 channel HV distributer modules for mainframe [[17]]
  • Accessory CAEN A1531 primary PSU for HV mainframe - no specific manual online, contacted CAEN and they refer to this document [[18]]
  • AGILENT N5761A DC power supply unit for NINO front end cards, 19" wide, 1U, rack-mountable [[19]]
  • Wiener 6U VME64x 6023 crate [[20]]