HCAL Reports/Updates

From Hall A Wiki
Revision as of 16:21, 17 March 2020 by Skbarcus (Talk | contribs)

Jump to: navigation, search

return to SBS wiki

This page acts as an archive of the various talks, reports, updates, and presentations regarding HCAL-J.

2020

  • DAQ Update (fADC Timing) Slides: 13 March, 2020 pdf
  • DAQ Update (TDC Timing) Slides: 7 February, 2020 pdf

2019

  • Electronics/DAQ Update: 14 November 2019 (url) [1]
  • Notes from SBS GMn-GEn-RP Preparedness Review: 4-5 August, 2019 download docx
  • SBS Collaboration Meeting Status Update: 5 August 2019 (url) [2]
  • Timeline: 22 May 2019 (url) [3]
  • Quick Timing Analysis: 21 February 2019 (url) [4]
  • Cabling Maps: 14 February 2019 (url) [5]

2018

  • Paper: HCAL-J: "Hadron Calorimeter for the Study of Nucleon Form Factors at Jefferson Lab", Published 22 October, 2018, in Radiation Effects and Defects in Solids pdf
  • Hadron Calorimeter Assembly Update: 17 October 2018 (url) [6]
  • Status of HCal Project: 5 September 2018 (url) [7]
  • HCal-J Status: 7 August 2018 (url) [8]
  • Overview and Status Slides: 22 July, 2018 pdf
  • Electronics Update Slides: 25 April, 2018 pdf

2017

  • SBS HCAL – FADC update: 20 September 2017 (url) [9]
  • HCAL-J Status: 13 September 2017 (url) [10]
  • Response to ERR Comments and Recommendations on GMN Detector Simulations: 17 July, 2017 pdf
  • HCAL-J Status: 26 April 2017 (url) [11]

2016

  • HCal Electronics with First-level ECal trig: 23 August 2016 (url) [12]
  • HCal Electronics with First-level ECal trig: 27 April 2016 (url) [13]
  • HCAL-J Status: 11 May 2016 (url) [14]
  • HCal Electronics with First-level ECal trig: 9 March 2016 (url) [15]
  • HCal Height and GMn Acceptance: 4 May 2016 (url) [16]

2015

  • HCal Electronics with First-level ECal trig: 4 November 2015 (url) [17]
  • HCal Electronics with First-level ECal trig: 21 October 2015 (url) [18]
  • HCAL-J Status: 30 September 2015 (url) [19]
  • SBS Meeting Simulated HCal-J Time Resolution: 1 April 2015 (url) [20]
  • HCAL-J Update: March 2015 Download at following url [21] called HCALJ Status Mar 2015.pptx.

2014

  • HCal Spacial Resolution with Brick Wall Stacking: 4 February 2014 (url) [22]
  • HCAL-J Update Light Guides: October 2014 (url) [23]
  • HCAL-J Activities: July/August2014 (url) [24]
  • HCALJ Update: June 2014 (url) [25]
  • HCAL-J Status: April 2014 (url) [26]
  • HCAL-J Update: February 2014 (url) [27]

2013

  • HCAL-J Status: December 2013 (url) [28]
  • Timeline: 20 November 2013 (url) [29]
  • HCAL-J Status: September 2013 (url) [30]
  • Scintillators for HCal: 20 March 2013 (url) [31]
  • HCAL Development: 23 January 2013 (url) [32]
  • HCAL-J: 2013 (url) [33]

2012

  • Development of HCAL Detector: February/March 2012 (url) [34]
  • Hadron Calorimeter for Hall A (HCAL-J): 11 July 2012 (url) [35]
  • Hadron Calorimeter for Hall A (HCAL-J): 26 September 2012 (url) [36]
  • HCal-cal: 2014 (url) [37]

Other

  • Hadron Calorimeter for the SBS: pdf