HCAL Reports/Updates
From Hall A Wiki
This page acts as an archive of the various talks, reports, updates, and presentations regarding HCAL-J.
2020
- DAQ Update (fADC Timing) Slides: 13 March, 2020 pdf
- DAQ Update (TDC Timing) Slides: 7 February, 2020 pdf
2019
- Electronics/DAQ Update: 14 November 2019 (url) [1]
- Notes from SBS GMn-GEn-RP Preparedness Review: 4-5 August, 2019 download docx
- SBS Collaboration Meeting Status Update: 5 August 2019 (url) [2]
- Timeline: 22 May 2019 (url) [3]
- Quick Timing Analysis: 21 February 2019 (url) [4]
- Cabling Maps: 14 February 2019 (url) [5]
2018
- Paper: HCAL-J: "Hadron Calorimeter for the Study of Nucleon Form Factors at Jefferson Lab", Published 22 October, 2018, in Radiation Effects and Defects in Solids pdf
- Hadron Calorimeter Assembly Update: 17 October 2018 (url) [6]
- Status of HCal Project: 5 September 2018 (url) [7]
- HCal-J Status: 7 August 2018 (url) [8]
- Overview and Status Slides: 22 July, 2018 pdf
- Electronics Update Slides: 25 April, 2018 pdf
2017
- HCal Electronics: 20 December, 2017 download pptx
- SBS HCAL – FADC update: 20 September 2017 (url) [9]
- HCAL-J Status: 13 September 2017 (url) [10]
- Response to ERR Comments and Recommendations on GMN Detector Simulations: 17 July, 2017 pdf
- HCAL-J Status: 26 April 2017 (url) [11]
2016
- HCal Electronics with First-level ECal trig: 23 August 2016 (url) [12]
- HCal Electronics with First-level ECal trig: 27 April 2016 (url) [13]
- HCAL-J Status: 11 May 2016 (url) [14]
- HCal Electronics with First-level ECal trig: 9 March 2016 (url) [15]
- HCal Height and GMn Acceptance: 4 May 2016 (url) [16]
2015
- HCal Electronics with First-level ECal trig: 4 November 2015 (url) [17]
- HCal Electronics with First-level ECal trig: 21 October 2015 (url) [18]
- HCAL-J Status: 30 September 2015 (url) [19]
- SBS Meeting Simulated HCal-J Time Resolution: 1 April 2015 (url) [20]
- HCAL-J Update: March 2015 Download at following url [21] called HCALJ Status Mar 2015.pptx.
2014
- HCal Spacial Resolution with Brick Wall Stacking: 4 February 2014 (url) [22]
- HCAL-J Update Light Guides: October 2014 (url) [23]
- HCAL-J Activities: July/August2014 (url) [24]
- HCALJ Update: June 2014 (url) [25]
- HCAL-J Status: April 2014 (url) [26]
- HCAL-J Update: February 2014 (url) [27]
2013
- HCAL-J Status: December 2013 (url) [28]
- Timeline: 20 November 2013 (url) [29]
- HCAL-J Status: September 2013 (url) [30]
- Scintillators for HCal: 20 March 2013 (url) [31]
- HCAL Development: 23 January 2013 (url) [32]
- HCAL-J: 2013 (url) [33]
2012
- Development of HCAL Detector: February/March 2012 (url) [34]
- Hadron Calorimeter for Hall A (HCAL-J): 11 July 2012 (url) [35]
- Hadron Calorimeter for Hall A (HCAL-J): 26 September 2012 (url) [36]
- HCal-cal: 2014 (url) [37]
Other
- Hadron Calorimeter for the SBS: pdf