During the running of Hall A experiments individuals authorized to make
significant
modifications, repairs, and/or changes to the operating status of equipment
will be limited to the
resident ``experts" or persons under their direct supervision. Note:
significant changes to the
operating status of equipment means changes beyond the nominal operating
parameters of the
subsystems. These ``experts" are primarily the Jefferson Lab staff members or users
who were
principles in designing, building and testing the subsystems. More details,
the current lists and
procedures for adding to the list of experts individuals are available in
Chapter ,
``Personnel Allowed to Operate Hall A Equipment." This document expanded and
tailored to the
specific experiment should accompany the user generated ``Conduct of
Operations Document
(COO)." ``Operational Safety Procedures for Hall A"and the ``Safety
Assessment Document
for Hall A Equipment" are the core operations documents for Hall A equipment.