Difference between revisions of "G2p shifts"

From Hall A Wiki
Jump to: navigation, search
(How To Avoid Disasters)
Line 22: Line 22:
 
* Target [https://hallaweb.jlab.org/wiki/index.php/Target_Troubleshooting_Procedures Troubleshooting] and [https://hallaweb.jlab.org/wiki/index.php/Solid_Polarized_Target target overview]
 
* Target [https://hallaweb.jlab.org/wiki/index.php/Target_Troubleshooting_Procedures Troubleshooting] and [https://hallaweb.jlab.org/wiki/index.php/Solid_Polarized_Target target overview]
  
==How To Avoid Disasters==
+
==Shift Instructions ==
 
* The septa current must be set to match each new spectrometer dipole momentum setting.
 
* The septa current must be set to match each new spectrometer dipole momentum setting.
 
* Make sure to acknowledge the DAQ popup messages for Start and End of every run.
 
* Make sure to acknowledge the DAQ popup messages for Start and End of every run.

Revision as of 15:20, 13 April 2012

This page is updated frequently. Please hit Reload at least once per shift.

Basic Resources for Shift Workers

How Tos

Shift Instructions

  • The septa current must be set to match each new spectrometer dipole momentum setting.
  • Make sure to acknowledge the DAQ popup messages for Start and End of every run.
  • Keep a stripchart running of the septa currents. Log any fluctuations, and notify Run Coordinator.
  • Take bleedthru measurement once a shift
  • Make sure you know exactly what you are doing if operating the Sieve Slit. Compare to this photo

Useful Links

Notes

  • The Coda configuration is: LHRS, RHRS
  • Hall A current : Open Monticello / Wall / Hall A GUI, and look at the 1H00 BCM.
  • For Hall A tools screen, on hacuser type "NewTools" which pops up EOSMenu. Select "HLAmain".
  • For Stripchart, click toolbox on bottom of desktop menu
  • IHWP1 flips the beam helicity. IHWP2 is passive (actually a full wave plate) and will not flip the helicity. The epics var for IHWP2 is IGL1I00DIOFLRD :13056 means the passive wave-plate is in. 8960 is out..