Difference between revisions of "G2p shifts"
From Hall A Wiki
(→How To Avoid Disasters) |
(→Notes) |
||
Line 40: | Line 40: | ||
*Hall A [http://hallaweb.jlab.org/equipment/moller Moller] | *Hall A [http://hallaweb.jlab.org/equipment/moller Moller] | ||
− | ===Notes=== | + | ===Miscellaneous Notes=== |
*The Coda configuration is: LHRS, RHRS | *The Coda configuration is: LHRS, RHRS | ||
− | *Hall A current : Open Monticello / Wall / Hall A GUI, and look at the 1H00 BCM. | + | *To read the Hall A current : Open Monticello / Wall / Hall A GUI, and look at the 1H00 BCM. |
− | * | + | *To open the Hall A tools screen, as hacuser type "NewTools" which pops up EOSMenu. Select "HLAmain". |
− | * | + | *To start a Stripchart, click toolbox on bottom of desktop menu |
− | *IHWP1 flips the beam helicity. IHWP2 is passive | + | *Only IHWP1 flips the beam helicity. IHWP2 is passive. |
Revision as of 15:22, 13 April 2012
This page is updated frequently. Please hit Reload at least once per shift.
Contents
Basic Resources for Shift Workers
- Links: (Halog) (tlog)(g2pwiki) (ShiftSchedule) (MCC) (bta) (LSummary) (RSummary)
- Today's runplan
- Expert contact list and Expert Shifts
- Run Sheets (pdf) and Shift checklist
How Tos
- How to run the g2p DAQ
- How to Set the Spectrometer and Septa Magnets
- How to Cycle the Quadrupoles
- How to make vertical correction to target insert
- How to take HARP scan
- How to recover the beam after an extended (>4 hour) down: G2p-beam-recovery
- How to recover BPM positions after a long beam trip or tune change
- How to check Bleed-thru
- How to Set the Slow Raster
- How to check IHWP change in state and alarm
- How to control the Hall A Dump Camera Light
- How to run the Online Replay
- Target Troubleshooting and target overview
Shift Instructions
- The septa current must be set to match each new spectrometer dipole momentum setting.
- Make sure to acknowledge the DAQ popup messages for Start and End of every run.
- Keep a stripchart running of the septa currents. Log any fluctuations, and notify Run Coordinator.
- Take bleedthru measurement once a shift
- Make sure you know exactly what you are doing if operating the Sieve Slit. Compare to this photo
Useful Links
- The g2p Analysis Guide
- Beamline Component locations
- Chicane Positions
- MCC Whiteboard +offsite access to logs (courtesy Brad)
- d2n HowTo (Please note some info is out of date).
- Spring11 HowTo (Please note some info is out of date).
- Online Replay Guide (detailed) (Old Transversity Guide) (Please note some info is out of date).
- mysql Run Database for gep/g2p
- Hall A Moller
Miscellaneous Notes
- The Coda configuration is: LHRS, RHRS
- To read the Hall A current : Open Monticello / Wall / Hall A GUI, and look at the 1H00 BCM.
- To open the Hall A tools screen, as hacuser type "NewTools" which pops up EOSMenu. Select "HLAmain".
- To start a Stripchart, click toolbox on bottom of desktop menu
- Only IHWP1 flips the beam helicity. IHWP2 is passive.