Difference between revisions of "G2p shifts"

From Hall A Wiki
Jump to: navigation, search
Line 40: Line 40:
 
*Hall A [http://hallaweb.jlab.org/equipment/moller Moller]
 
*Hall A [http://hallaweb.jlab.org/equipment/moller Moller]
  
===Miscellaneous Notes===
+
==Miscellaneous Notes==
 
*The Coda configuration is: LHRS, RHRS
 
*The Coda configuration is: LHRS, RHRS
 
*To read the Hall A current : Open Monticello / Wall / Hall A GUI, and look at the 1H00 BCM.
 
*To read the Hall A current : Open Monticello / Wall / Hall A GUI, and look at the 1H00 BCM.

Revision as of 15:25, 13 April 2012

This page is updated frequently. Please hit Reload at least once per shift.

Basic Resources for Shift Workers

Shift Instructions

  • The septa current must be set to match each new spectrometer dipole momentum setting.
  • Make sure to acknowledge the DAQ popup messages for Start and End of every run.
  • Keep a stripchart running of the septa currents. Log any fluctuations, and notify Run Coordinator.
  • Take bleedthru measurement once a shift
  • Make sure you know exactly what you are doing if operating the Sieve Slit. Compare to this photo

How Tos


Useful Links

Miscellaneous Notes

  • The Coda configuration is: LHRS, RHRS
  • To read the Hall A current : Open Monticello / Wall / Hall A GUI, and look at the 1H00 BCM.
  • To open the Hall A tools screen, as hacuser type "NewTools" which pops up EOSMenu. Select "HLAmain".
  • To start a Stripchart, click toolbox on bottom of desktop menu
  • Only IHWP1 flips the beam helicity. IHWP2 is passive.