Difference between revisions of "GMp"
From Hall A Wiki
(→Fall 2016 Run plan) |
|||
Line 69: | Line 69: | ||
*[http://hallaweb.jlab.org/12GeV/experiment/E12-07-108/Publications/Technical/Spectrometer/65410-E-17010-00.pdf HRS Schematics] | *[http://hallaweb.jlab.org/12GeV/experiment/E12-07-108/Publications/Technical/Spectrometer/65410-E-17010-00.pdf HRS Schematics] | ||
+ | |||
+ | == Analysis == | ||
+ | |||
+ | * Simulation using SIMC | ||
== Old Links == | == Old Links == |
Revision as of 18:31, 16 February 2017
Contents
Overview
Shift Crew Information
Expert Shift Schedule
- Fall 2016 Expert Schedule
- Fall 2016 Expert Checklist
Fall 2016 Run plan
- Parasitic Production Run Plan R-HRS 48.75 degrees
- Overview of Fall 2016 Run Plan
- Requested Spectrometer Pointing Surveys
- Boiling Study
- Commissioning Run Plan Fall 2016
- Quad Tuning Run Plan Fall 2016 (First Pass) 48.75 degrees
- Optics Run Plan Fall 2016 (First Pass) 48.75 degrees
- GMp Production Run Plan, Dedicated Time L-HRS and R-HRS
- Run summary for commissioning in fall 2016
- Run list with stability check
Spring 2016 Run plan
- Boiling Study
- Production Run Plan GMp Dedicated Time L-HRS and R-HRS
- Production Run Plan R-HRS
- Commissioning Run Plan 2016
- Optics Run Plan Spring 2016 (First Pass) 48.8 degrees
- Run summary for commissioning in spring 2016
Spring 2015 Run plan
- Optics Run Plan Spring 2015 (Second Pass) 48 degrees
- Optics Run Plan Spring 2015 (Second Pass) 52.5 degrees
- Optics Run Plan Spring 2015 (First Pass)
- Optics Run Plan Spring 2015 (Second Pass)
- Optics run in spring 2015
- Production Run Summary
Fall 2014 Run plan
Meetings
HRS Information
Analysis
- Simulation using SIMC