Difference between revisions of "GMp"
From Hall A Wiki
(→Fall 2016 Run plan) |
|||
(24 intermediate revisions by 4 users not shown) | |||
Line 13: | Line 13: | ||
* ''' Fall 2016 [[Expert Schedule]]''' | * ''' Fall 2016 [[Expert Schedule]]''' | ||
− | * | + | * ''' Fall 2016 [[Expert Checklist ]]''' |
− | + | ||
== '''Fall 2016 Run plan''' == | == '''Fall 2016 Run plan''' == | ||
− | * [http://hallaweb.jlab.org/12GeV/experiment/E12-07-108/Documents/GMp_fall_2016.pdf Fall 2016 Run Plan] | + | * [[Parasitic Production Run Plan R-HRS 48.75 degrees]] |
− | * [https://hallaweb.jlab.org/wiki/index.php/ | + | * [http://hallaweb.jlab.org/12GeV/experiment/E12-07-108/Documents/GMp_fall_2016.pdf Overview of Fall 2016 Run Plan] |
− | + | * [[Requested Spectrometer Pointing Surveys]] | |
+ | * [http://hallaweb.jlab.org/12GeV/experiment/E12-07-108/Documents/boiling_fall_2016.pdf Boiling Study] | ||
+ | * [[Commissioning Run Plan Fall 2016]] | ||
+ | * [https://hallaweb.jlab.org/wiki/index.php/Quad_Tuning_1pass_48d Quad Tuning Run Plan Fall 2016 (First Pass) 48.75 degrees] | ||
* [https://hallaweb.jlab.org/wiki/index.php/Spectrometer_Optics_First_pass_48p75d Optics Run Plan Fall 2016 (First Pass) 48.75 degrees] | * [https://hallaweb.jlab.org/wiki/index.php/Spectrometer_Optics_First_pass_48p75d Optics Run Plan Fall 2016 (First Pass) 48.75 degrees] | ||
+ | * [[GMp Production Run Plan, Dedicated Time L-HRS and R-HRS]] | ||
+ | * [[Run summary for commissioning in fall 2016 ]] | ||
+ | * [[Run list with stability check]] | ||
== Spring 2016 Run plan == | == Spring 2016 Run plan == | ||
Line 48: | Line 53: | ||
* [https://hallaweb.jlab.org/dvcslog/Gmp/ Analysis Elog] | * [https://hallaweb.jlab.org/dvcslog/Gmp/ Analysis Elog] | ||
+ | |||
+ | == HRS Information == | ||
+ | |||
+ | * [http://hallaweb.jlab.org/12GeV/experiment/E12-07-108/Publications/Technical/Detector_Info/HRS_Detector_Positions_Sp16.pdf Spring 2016 Detector Positions] | ||
+ | |||
+ | * [http://hallaweb.jlab.org/12GeV/experiment/E12-07-108/Publications/Technical/Detector_Info/HRS_Detector_Positions_Fall16.pdf Fall 2016 Detector Positions] | ||
+ | |||
+ | * [http://hallaweb.jlab.org/12GeV/experiment/E12-07-108/Publications/Technical/Spectrometer/Spring16/HRS_Material_Sp16.pdf Spring 2016 Target, Spec., etc. Material] | ||
+ | |||
+ | * [http://hallaweb.jlab.org/12GeV/experiment/E12-07-108/Publications/Technical/Spectrometer/Fall16/HRS_Material_Fall16.pdf Fall 2016 Target, Spec., etc. Material] | ||
+ | |||
+ | * [http://hallaweb.jlab.org/12GeV/experiment/E12-07-108/Publications/Technical/Spectrometer/Spring16/HRS_Schematics.pdf Spring 2016 HRS through Q1] | ||
+ | |||
+ | *[http://hallaweb.jlab.org/12GeV/experiment/E12-07-108/Publications/Technical/Spectrometer/Fall16/Right&Left_HRS_GMP_Fa16.pdf Fall 2016 HRS through Q1] | ||
+ | |||
+ | *[http://hallaweb.jlab.org/12GeV/experiment/E12-07-108/Publications/Technical/Spectrometer/65410-E-17010-00.pdf HRS Schematics] | ||
+ | |||
+ | == Analysis == | ||
+ | |||
+ | * [[Simulation using SIMC]] | ||
== Old Links == | == Old Links == |
Latest revision as of 18:32, 16 February 2017
Contents
Overview
Shift Crew Information
Expert Shift Schedule
- Fall 2016 Expert Schedule
- Fall 2016 Expert Checklist
Fall 2016 Run plan
- Parasitic Production Run Plan R-HRS 48.75 degrees
- Overview of Fall 2016 Run Plan
- Requested Spectrometer Pointing Surveys
- Boiling Study
- Commissioning Run Plan Fall 2016
- Quad Tuning Run Plan Fall 2016 (First Pass) 48.75 degrees
- Optics Run Plan Fall 2016 (First Pass) 48.75 degrees
- GMp Production Run Plan, Dedicated Time L-HRS and R-HRS
- Run summary for commissioning in fall 2016
- Run list with stability check
Spring 2016 Run plan
- Boiling Study
- Production Run Plan GMp Dedicated Time L-HRS and R-HRS
- Production Run Plan R-HRS
- Commissioning Run Plan 2016
- Optics Run Plan Spring 2016 (First Pass) 48.8 degrees
- Run summary for commissioning in spring 2016
Spring 2015 Run plan
- Optics Run Plan Spring 2015 (Second Pass) 48 degrees
- Optics Run Plan Spring 2015 (Second Pass) 52.5 degrees
- Optics Run Plan Spring 2015 (First Pass)
- Optics Run Plan Spring 2015 (Second Pass)
- Optics run in spring 2015
- Production Run Summary