Difference between revisions of "BigBite trigger and DAQ"
From Hall A Wiki
m |
|||
(One intermediate revision by one other user not shown) | |||
Line 25: | Line 25: | ||
* [[Starting CODA for shift workers]] | * [[Starting CODA for shift workers]] | ||
* [[Timing shift GMn]] | * [[Timing shift GMn]] | ||
− | * [[media:GENII-CODA_update_(3).pdf | GEnII CODA update]] | + | * [[media:GENII-CODA_update_(3).pdf | GEnII CODA update]] - the planned updates to CODA 3 configurations from the GMn to GEnII. |
+ | |||
+ | * [[Scaler and beamline crate]] |
Latest revision as of 10:43, 23 August 2024
This section's purpose is to compile and organize the documentation on the BigBite trigger and DAQ:
Trigger specific:
- Introduction to the Bigbite trigger logic for the SBS form factors experiments Source
- BigBite PS/SH trigger groups (pdf) XML source file for the new trigger groups scheme
- Bigbite trigger most up-to-date layout (pdf) XML source file for the layout
- cabling maps (pdf) []
The source files should be utilized as follows:
- download the source on your computer
- in your web browser, open https://draw.io
- The page will prompt you to create a new diagram or open an existing file: choose open the file and browse the source you want to read on your computer.
- You can now edit the source and modify the diagrams.
DAQ:
- BB electronic layout Racks 1-4 (will need update) (pdf)
- BB electronic layout Racks 5-8 (will need update) (pdf)
- XML source for BB weldment
- top view of cables path in BB electronic weldment
- BB cables projected path on Hall A floor
- global timing scheme
- SBS Network Devices in Hall A
- SBS TS cabling
- Crate resets
- Starting CODA for shift workers
- Timing shift GMn
- GEnII CODA update - the planned updates to CODA 3 configurations from the GMn to GEnII.