Difference between revisions of "G2p shifts"

From Hall A Wiki
Jump to: navigation, search
Line 5: Line 5:
 
* Expert contact [https://hallaweb.jlab.org/wiki/index.php/G2pcontacts list] and Expert [https://hallaweb.jlab.org/wiki/index.php/G2p_Expert_Shifts Shifts]
 
* Expert contact [https://hallaweb.jlab.org/wiki/index.php/G2pcontacts list] and Expert [https://hallaweb.jlab.org/wiki/index.php/G2p_Expert_Shifts Shifts]
 
* Run Sheets ([http://hallaweb.jlab.org/experiment/g2p/shifts/Run-Sheet_g2p_B.pdf pdf]) and Shift [http://hallaweb.jlab.org/experiment/g2p/shifts/shift-check-list.pdf checklist]
 
* Run Sheets ([http://hallaweb.jlab.org/experiment/g2p/shifts/Run-Sheet_g2p_B.pdf pdf]) and Shift [http://hallaweb.jlab.org/experiment/g2p/shifts/shift-check-list.pdf checklist]
 +
 +
==Shift Instructions ==
 +
* The septa current must be set to match each new spectrometer dipole momentum setting.
 +
* Make sure to acknowledge the DAQ popup messages for Start and End of every run.
 +
* Keep a stripchart running of the septa currents. Log <B>any</B> fluctuations, and notify Run Coordinator.
 +
* Take bleedthru measurement once a shift
 +
* Make sure you know exactly what you are doing if operating the Sieve Slit.  Compare to this [http://hallaweb.jlab.org/halog/log/html/1204_archive/120412082759.html photo]
  
 
==How Tos==
 
==How Tos==
Line 21: Line 28:
 
* Target [https://hallaweb.jlab.org/wiki/index.php/Target_Troubleshooting_Procedures Troubleshooting] and [https://hallaweb.jlab.org/wiki/index.php/Solid_Polarized_Target target overview]
 
* Target [https://hallaweb.jlab.org/wiki/index.php/Target_Troubleshooting_Procedures Troubleshooting] and [https://hallaweb.jlab.org/wiki/index.php/Solid_Polarized_Target target overview]
  
==Shift Instructions ==
 
* The septa current must be set to match each new spectrometer dipole momentum setting.
 
* Make sure to acknowledge the DAQ popup messages for Start and End of every run.
 
* Keep a stripchart running of the septa currents. Log <B>any</B> fluctuations, and notify Run Coordinator.
 
* Take bleedthru measurement once a shift
 
* Make sure you know exactly what you are doing if operating the Sieve Slit.  Compare to this [http://hallaweb.jlab.org/halog/log/html/1204_archive/120412082759.html photo]
 
  
 
==Useful Links==
 
==Useful Links==

Revision as of 15:24, 13 April 2012

This page is updated frequently. Please hit Reload at least once per shift.

Basic Resources for Shift Workers

Shift Instructions

  • The septa current must be set to match each new spectrometer dipole momentum setting.
  • Make sure to acknowledge the DAQ popup messages for Start and End of every run.
  • Keep a stripchart running of the septa currents. Log any fluctuations, and notify Run Coordinator.
  • Take bleedthru measurement once a shift
  • Make sure you know exactly what you are doing if operating the Sieve Slit. Compare to this photo

How Tos


Useful Links

Miscellaneous Notes

  • The Coda configuration is: LHRS, RHRS
  • To read the Hall A current : Open Monticello / Wall / Hall A GUI, and look at the 1H00 BCM.
  • To open the Hall A tools screen, as hacuser type "NewTools" which pops up EOSMenu. Select "HLAmain".
  • To start a Stripchart, click toolbox on bottom of desktop menu
  • Only IHWP1 flips the beam helicity. IHWP2 is passive.