Difference between revisions of "HCAL Reports/Updates"

From Hall A Wiki
Jump to: navigation, search
(2022)
(2022)
Line 4: Line 4:
  
 
===2022===
 
===2022===
*HCal Preliminary GMn Results, Hall A Collaboration Meeting. Feb 11th, 2022 [[https://sbs.jlab.org/DocDB/0001/000163/001/HCal_Presentation_Feb2022.pdf‎| Doc DB Link]]
+
*HCal Preliminary GMn Results, Hall A Collaboration Meeting. Feb 11th, 2022 [[https://sbs.jlab.org/cgi-bin/DocDB/private/ShowDocument?docid=163‎| Doc DB Link]]
  
 
===2021===
 
===2021===

Revision as of 15:58, 11 February 2022

return to SBS wiki

This page acts as an archive of the various talks, reports, updates, and presentations regarding HCAL-J.

2022

  • HCal Preliminary GMn Results, Hall A Collaboration Meeting. Feb 11th, 2022 [Doc DB Link]

2021

  • HCal Move Prep, SBS DAQ Meeting. May 14th, 2020 pdf
  • Modified PS706 SN21785 Discriminator Tests. March, 2021 (url) [1]
  • Modified PS706 SN22217 Discriminator Tests. April, 2021 (url) [2]
  • Modified PS706 SN4574 Discriminator Tests. April, 2021 (url) [3]
  • Modified PS706 SN20876 Discriminator Tests. April, 2021 (url) [4]
  • Modified PS706 SN17315 Discriminator Tests. April, 2021 (url) [5]

2020

  • HCal Status Update, SBS Weekly Meeting. November 9th, 2020 pdf
  • HCAL-J: A Segmented Hadron Calorimeter with High Time Resolution, DNP Talk. October 31st, 2020 pdf
  • HCal Status Update, SBS Weekly Meeting. 14 September, 2020 pdf
  • Neural Networks for Detector Triggers, AI/ML Town Hall August 28th, 2020 pdf
  • HCal Analysis and Efficiency Studies: Eric Fuchey, 26 August, 2020 pdf
  • HCal Update and LDRD Machine Learning Trigger Proposal: 14 July, 2020 (url) [6]
  • Energy Deposition Study Slides: 7 May, 2020 pdf
  • HCAL-J Cosmic Ray Test at JLab: Posted: 4 May, 2020. Research from June-July 2018 pdf
  • DAQ Update (fADC Timing) Slides: 13 March, 2020 pdf
  • DAQ Update (TDC Timing) Slides: 7 February, 2020 pdf

2019

  • Electronics/DAQ Update: 14 November 2019 (url) [7]
  • Notes from SBS GMn-GEn-RP Preparedness Review: 4-5 August, 2019 download docx
  • SBS Collaboration Meeting Status Update: 5 August 2019 (url) [8]
  • Timeline: 22 May 2019 (url) [9]
  • HCAL Commissioning: 26 February 2019 (url) [10]
  • Quick Timing Analysis: 21 February 2019 (url) [11]
  • HCal Cable Mapping Version 1.2: 18 February 2019 (url) [12]
  • Cabling Maps: 14 February 2019 (url) [13]

2018

  • Paper: HCAL-J: "Hadron Calorimeter for the Study of Nucleon Form Factors at Jefferson Lab", Published 22 October, 2018, in Radiation Effects and Defects in Solids pdf
  • SBS Detector Integration HCAL Electronics and DAQ Status, Needs, and Plans: 30 October 2018 (url) [14]
  • Status of HCal project: 30 October 2018 (url) [15]
  • Hadron Calorimeter Assembly Update: 17 October 2018 (url) [16]
  • Status of HCal Project: 5 September 2018 (url) [17]
  • HCal-J Status: 7 August 2018 (url) [18]
  • HCAL-J: Overview and Status Slides: 22 July, 2018 pdf
  • HCAL-J Electronics: 22 July 2018 (Download pptx at DocDB url) [19]
  • HCAL-J COSMIC RAY TEST AT JLAB: 18 June - 26 July 2018 pdf
  • 14th Workshop on European Collaboration in Higher Education on Radiological and Nuclear Engineering and Radiation Protection, HCAL-J: Hadron Calorimeter for the study of nucleon Form Factors at Jefferson Lab: 1 June 2018 (url) [20]
  • Electronics Update Slides: 25 April, 2018 pdf
  • HCAL-J: Overview and Status: 23 February 2018 (url) [21]
  • HCal Electronics: 23 February 2018 (Download pptx at url) [22]

2017

  • SBS HCAL – FADC update: 20 September 2017 (url) [23]
  • HCAL-J Status: 13 September 2017 (url) [24]
  • Response to ERR Comments and Recommendations on GMN Detector Simulations: 17 July, 2017 pdf
  • ERR Proposal Update: 2017 (url) [25]
  • ERR Wiki Page with Talks: 2017 (url) [26]
  • HCAL-J Status Update: 14 July 2017 (url) [27]
  • HCal Electronics: 14 July 2017 (Download pptx at url) [28]
  • HCAL-J Status: 26 April 2017 (url) [29]

2016

  • HCal Electronics with First-level ECal trig: 23 August 2016 (url) [30]
  • HCAL-J Status: 22 July 2016 (url) [31]
  • HCal Electronics with First-level ECal trig: 22 July 2016 (url) [32]
  • HCal Electronics with First-level ECal trig: 27 April 2016 (url) [33]
  • HCAL-J Status: 11 May 2016 (url) [34]
  • The SuperBigbite Program at JLab from Form Factors to SIDIS and TDIS: 18 April 2016 (url) [35]
  • HCal Electronics with First-level ECal trig: 9 March 2016 (url) [36]
  • HCal Height and GMn Acceptance: 4 May 2016 (url) [37]

2015

  • HCal Electronics with First-level ECal trig: 4 November 2015 (url) [38]
  • HCal Electronics with First-level ECal trig: 21 October 2015 (url) [39]
  • HCAL-J Status: 30 September 2015 (url) [40]
  • HCAL-J Status: 16 July 2015 (url) [41]
  • SBS Meeting Simulated HCal-J Time Resolution: 1 April 2015 (url) [42]
  • HCAL-J Update: March 2015 (Download pptx at url) [43] called HCALJ Status Mar 2015.pptx.

2014

  • HCal Spacial Resolution with Brick Wall Stacking: 4 February 2014 (url) [44]
  • HCAL-J Update Light Guides: October 2014 (url) [45]
  • HCAL-J: a Hadron Calorimeter for the Hall A SuperBigByteSpectrometer at JLab: 25 September 2014 (url) [46]
  • HCAL-J Activities: July/August2014 (url) [47]
  • HCAL-J Status: 8 July (url) [48]
  • HCALJ Update: June 2014 (url) [49]
  • HCAL-J Status: April 2014 (url) [50]
  • HCAL-J Update: February 2014 (url) [51]
  • SBS Hadron Calorimeter Design Issues: 2014 (url) [52]
  • HCal-cal: 2014 (url) [53]

2013

  • HCAL-J Status: December 2013 (url) [54]
  • Timeline: 20 November 2013 (url) [55]
  • HCAL-J Status: September 2013 (url) [56]
  • Simulation and Design of a Hadron Calorimeter for Jefferson Lab Hall-A Super Bigbite Spectrometer: 4 June 2013 (url) [57]
  • Hadron Calorimeter Construction: 4 June 2013 (url) [58]
  • Scintillators for HCal: 20 March 2013 (url) [59]
  • HCAL Development: 23 January 2013 (url) [60]
  • HCAL-J: 2013 (url) [61]

2012

  • Development of HCAL Detector: February/March 2012 (url) [62]
  • Hadron Calorimeter for Hall A (HCAL-J): 11 July 2012 (url) [63]
  • Hadron Calorimeter: 13 October 2012 (url) [64]
  • Hadron Calorimeter for Hall A (HCAL-J): 26 September 2012 (url) [65]

2010

  • SBS Hadron and Electron Calorimeters: 22 January 2010 (url) [66]

2009

  • SBS Hadron Calorimeter Design Issues: 13 June 2009 (url) [67]

2008

  • Scintillator Fiber Tracker and Hadron Calorimeter for Super-Bigbite Spectrometer: 17 November 2008 (url) [68]
  • Hadron Calorimeter (HCAL) for SBS: 5 September 2008 (url) [69]

Other

  • Hadron Calorimeter for the SBS: pdf