GMp
From Hall A Wiki
Contents
Overview
Shift Crew Information
Expert Shift Schedule
- Fall 2016 Expert Schedule
- Fall 2016 Expert Checklist
Fall 2016 Run plan
- Parasitic Production Run Plan R-HRS 48.75 degrees
- Overview of Fall 2016 Run Plan
- Requested Spectrometer Pointing Surveys
- Boiling Study
- Commissioning Run Plan Fall 2016
- Quad Tuning Run Plan Fall 2016 (First Pass) 48.75 degrees
- Optics Run Plan Fall 2016 (First Pass) 48.75 degrees
- GMp Production Run Plan, Dedicated Time L-HRS and R-HRS
- Run summary for commissioning in fall 2016
- Run list with stability check
Spring 2016 Run plan
- Boiling Study
- Production Run Plan GMp Dedicated Time L-HRS and R-HRS
- Production Run Plan R-HRS
- Commissioning Run Plan 2016
- Optics Run Plan Spring 2016 (First Pass) 48.8 degrees
- Run summary for commissioning in spring 2016
Spring 2015 Run plan
- Optics Run Plan Spring 2015 (Second Pass) 48 degrees
- Optics Run Plan Spring 2015 (Second Pass) 52.5 degrees
- Optics Run Plan Spring 2015 (First Pass)
- Optics Run Plan Spring 2015 (Second Pass)
- Optics run in spring 2015
- Production Run Summary
Fall 2014 Run plan
Meetings
HRS Information
Analysis
- Simulation using SIMC