Difference between revisions of "GEM Electronics Review"
From Hall A Wiki
(4 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
[https://hallaweb.jlab.org/wiki/images/e/e1/GEM-daq-review-charge.pdf Charge] to the reviewers. | [https://hallaweb.jlab.org/wiki/images/e/e1/GEM-daq-review-charge.pdf Charge] to the reviewers. | ||
− | = UVa | + | = UVa Rear tracker GEMs= |
*[https://hallaweb.jlab.org/wiki/images/f/f3/APV25_readout_system_for_SBS_07_2014.pdf Report] by UVa on the CERN SRS electronics system with a budget and also includes a budget for using the INFN GEM electronics system. | *[https://hallaweb.jlab.org/wiki/images/f/f3/APV25_readout_system_for_SBS_07_2014.pdf Report] by UVa on the CERN SRS electronics system with a budget and also includes a budget for using the INFN GEM electronics system. | ||
*[https://hallaweb.jlab.org/wiki/images/f/f2/Italian-daq-report-june23-2014_-v2.pdf Report] by INFN on their GEM electronics system. | *[https://hallaweb.jlab.org/wiki/images/f/f2/Italian-daq-report-june23-2014_-v2.pdf Report] by INFN on their GEM electronics system. | ||
*[https://hallaweb.jlab.org/wiki/images/2/26/Protype_APV25_SRS_readout_system.pdf Report] by UVa on SRS readout tests using prototype GEM modules. | *[https://hallaweb.jlab.org/wiki/images/2/26/Protype_APV25_SRS_readout_system.pdf Report] by UVa on SRS readout tests using prototype GEM modules. | ||
− | *[http://hallaweb.jlab.org/12GeV/SuperBigBite/November-13-rev-talks/Nilanga.pdf Presentation] on the | + | *[http://hallaweb.jlab.org/12GeV/SuperBigBite/November-13-rev-talks/Nilanga.pdf Presentation] on the Rear tracker GEMs to the Nov 2013 DOE review. |
*[https://hallaweb.jlab.org/wiki/images/d/d4/SRS_JINST.pdf The Front-End Concentrator card for the RD51 Scalable Readout System], J. Toledo, H. Muller, R. Esteve, J.M. Monz´, A. Tarazona and S. Martoiu, JINST 6 C11028, 2011 | *[https://hallaweb.jlab.org/wiki/images/d/d4/SRS_JINST.pdf The Front-End Concentrator card for the RD51 Scalable Readout System], J. Toledo, H. Muller, R. Esteve, J.M. Monz´, A. Tarazona and S. Martoiu, JINST 6 C11028, 2011 | ||
− | *[https://hallaweb.jlab.org/wiki/images/9/9c/Muller_SRS_04_2011.pdf Presentation] | + | *Presentations given by Dr. Hans Muller, head of the RD51 electronics working group, on SRS systems. |
+ | **[https://hallaweb.jlab.org/wiki/images/9/9c/Muller_SRS_04_2011.pdf Presentation] given at the RD51 Collaboration Meeting, April 14, 2011: the currently available SRS system. | ||
+ | **[https://hallaweb.jlab.org/wiki/images/3/3c/ATCA_framework_for_SRS.pdf Presentation] given at the RD51 Collaboration Meeting, April 16, 2012: the ATCA based SRS system | ||
=INFN Front Tracker GEMs= | =INFN Front Tracker GEMs= | ||
*[http://hallaweb.jlab.org/12GeV/SuperBigBite/November-13-rev-talks/Evaristo.pdf Presentation] on the Front tracker GEMs to the Nov 2013 DOE review. | *[http://hallaweb.jlab.org/12GeV/SuperBigBite/November-13-rev-talks/Evaristo.pdf Presentation] on the Front tracker GEMs to the Nov 2013 DOE review. | ||
− | * Short reports on Front tracker status | + | *[https://hallaweb.jlab.org/wiki/images/3/36/INFN-MPD_FPGA_Specifications.pdf Report ] on INFN-MPD FPGA Specifications. |
+ | *[https://hallaweb.jlab.org/wiki/images/0/05/INFN-APV25_Front_End_Card_and_Interconnecting_Backplane_User_Guide.pdf User Guide ] on INFN-APV25 Front End Card and Interconnecting Backplane. | ||
+ | *Short reports on Front tracker status | ||
**[http://hallaweb.jlab.org/12GeV/SuperBigBite/SBS-minutes/2014/140205_Front_Tracker_Status.pdf Feb 5 2014 report] | **[http://hallaweb.jlab.org/12GeV/SuperBigBite/SBS-minutes/2014/140205_Front_Tracker_Status.pdf Feb 5 2014 report] | ||
**[http://hallaweb.jlab.org/12GeV/SuperBigBite/SBS-minutes/2014/140319_FrontTrackerStatus.pdf Mar 19 2014 report] | **[http://hallaweb.jlab.org/12GeV/SuperBigBite/SBS-minutes/2014/140319_FrontTrackerStatus.pdf Mar 19 2014 report] | ||
+ | = Reviewers reports = | ||
+ | *[https://hallaweb.jlab.org/wiki/images/9/9c/SBS_GEM_DAQ_Electronics_Review-abbott.pdf Reprot] by David Abbott. | ||
+ | *[https://hallaweb.jlab.org/wiki/images/2/27/SBS_GEM_DAQ_Electronics_Review-kohl.pdf Report] by Michael Kohl. | ||
+ | *[https://hallaweb.jlab.org/wiki/images/1/15/GEM-SBS-REAR-Tracker-Review-surrow.pdf Report] by Bernd Surrow. |
Latest revision as of 08:36, 8 October 2014
Charge to the reviewers.
UVa Rear tracker GEMs
- Report by UVa on the CERN SRS electronics system with a budget and also includes a budget for using the INFN GEM electronics system.
- Report by INFN on their GEM electronics system.
- Report by UVa on SRS readout tests using prototype GEM modules.
- Presentation on the Rear tracker GEMs to the Nov 2013 DOE review.
- The Front-End Concentrator card for the RD51 Scalable Readout System, J. Toledo, H. Muller, R. Esteve, J.M. Monz´, A. Tarazona and S. Martoiu, JINST 6 C11028, 2011
- Presentations given by Dr. Hans Muller, head of the RD51 electronics working group, on SRS systems.
- Presentation given at the RD51 Collaboration Meeting, April 14, 2011: the currently available SRS system.
- Presentation given at the RD51 Collaboration Meeting, April 16, 2012: the ATCA based SRS system
INFN Front Tracker GEMs
- Presentation on the Front tracker GEMs to the Nov 2013 DOE review.
- Report on INFN-MPD FPGA Specifications.
- User Guide on INFN-APV25 Front End Card and Interconnecting Backplane.
- Short reports on Front tracker status