Difference between revisions of "Target Lab Main"
From Hall A Wiki
(→TODO List) |
|||
Line 21: | Line 21: | ||
* Laser Subsystem | * Laser Subsystem | ||
** {{pass |Cleaning optics stuff}} | ** {{pass |Cleaning optics stuff}} | ||
− | ** {{pass |Q-wave plate calibration}} | + | ** {{pass |[[Target_Lab_Main#1.2F4-Wave_Plate_Calibration | Q-wave plate calibration]]}} |
** Install optics | ** Install optics | ||
** low power alignment | ** low power alignment | ||
Line 43: | Line 43: | ||
** EPR frequency lock | ** EPR frequency lock | ||
** EPR Operational | ** EPR Operational | ||
− | |||
== Records == | == Records == |
Revision as of 23:23, 17 March 2010
This is main page for work in EEL target lab since 2010.
Contents
Experiment Log
TODO List
- Clean and organize target lab
- Around He3 Cell
- Oven positioning
- Holding field hardware
- Air flow test
- Heater test
- Setup RTD reader
- Setup spectrometer
- Install He3 cell
- Install target chamber pickup coils
- Attach RTDs
- Laser Subsystem
- Cleaning optics stuff
- Q-wave plate calibration
- Install optics
- low power alignment
- High power alignment
- Optical Pumping Operational
- NMR Polarimetery
- NMR RF Delivery
- Pumping chamber pick up coil setup
- Target chamber pick up coil setup
- pick up coil alignment
- NMR code
- NMR Operational
- water NMR
- EPR Polarimetery
- EPR RF Delivery
- D2 light collection
- EPR code
- EPR line shape
- EPR frequency lock
- EPR Operational
Records
1/4-Wave Plate Calibration
3/15/2010
COMET LASER (JLAB #1)
half power - 12.2 W
I=30A T=20C
1/4-Wave Plate | Angle | Residual Power |
---|---|---|
#101 | 286° | Reference |
#102 | 214° | 272 mW |
#19 | 127° | 256 mW |
#16 | 330° | 185 mW |
#21 | 240° | 165 mW |
#2 | 76° | 55 mW |
#25 | 120° | 164 mW |
#20 | 225° | 114 mW |
Also #17 and #7 are identified as half wave plates.
Cell Inventory
Manuals
Old Hall Setting Documentations
- Basic He3 Target Information
- He3 Target Logbook
- Target Ladder diagram
- Complete System Diagram
- Target preliminary survey of ladder before change ( scheduled to be done on monday November 11th 2008)
- Strip Charts
- Special Procedure For Moving Target
- Procedure for Longitudinal 3He Elastic Measurement
- Target Slow Control
- Online Spin Flip
Check Lists
- eed Target Operator Check List
- Target Operator Check List
- d2n Target Operator Check List
- Hall Access Check List
- Target Enclosure Work Checklist