Difference between revisions of "Hall A He3 Polarized Target"
From Hall A Wiki
Line 1: | Line 1: | ||
− | [[Target Lab Main | Target Lab]] | + | ===[[Target Lab Main | Target Lab]]=== |
=== System Description === | === System Description === |
Revision as of 22:39, 15 March 2010
Target Lab
System Description
- Basic He3 Target Information
- He3 Target Logbook
- Target Ladder diagram
- Complete System Diagram
- Target preliminary survey of ladder before change ( scheduled to be done on monday November 11th 2008)
Manuals
- Special Procedure For Moving Target
- Procedure for Longitudinal 3He Elastic Measurement
- Holding Field Control
- Target Slow Control
- Online Spin Flip
- NMR Measurement
- EPR Measurement
- Laser Control
- Oven Control
- Strip Charts
Check Lists
- eed Target Operator Check List
- Target Operator Check List
- d2n Target Operator Check List
- Hall Access Check List
- Target Enclosure Work Checklist