Difference between revisions of "Target Lab Main"

From Hall A Wiki
Jump to: navigation, search
(Experiment Log)
Line 30: Line 30:
 
** {{pass |NMR RF Delivery}}
 
** {{pass |NMR RF Delivery}}
 
** {{pass |Pumping chamber pick up coil setup}}
 
** {{pass |Pumping chamber pick up coil setup}}
** Target chamber pick up coil setup
+
** {{pass |Target chamber pick up coil setup}}
 
** pick up coil alignment
 
** pick up coil alignment
 
** NMR code
 
** NMR code

Revision as of 23:08, 17 March 2010

This is main page for work in EEL target lab since 2010.

Experiment Log

TODO List

  • Clean and organize target lab
  • Around He3 Cell
    • Oven positioning
    • Holding field hardware
    • Air flow test
    • Heater test
    • Setup RTD reader
    • Setup spectrometer
    • Install He3 cell
    • Install target chamber pickup coils
    • Attach RTDs
  • Laser Subsystem
    • Cleaning optics stuff
    • Q-wave plate calibration
    • Install optics
    • low power alignment
    • High power alignment
    • Optical Pumping Operational
  • NMR Polarimetery
    • NMR RF Delivery
    • Pumping chamber pick up coil setup
    • Target chamber pick up coil setup
    • pick up coil alignment
    • NMR code
    • NMR Operational
    • water NMR
  • EPR Polarimetery
    • EPR RF Delivery
    • D2 light collection
    • EPR code
    • EPR line shape
    • EPR frequency lock
    • EPR Operational

1/4-Wave Plate Calibration

3/15/2010
COMET LASER (JLAB #1)
half power - 12.2 W
I=30A T=20C

1/4-Wave Plate Angle Residual Power
#101 286° Reference
#102 214° 272 mW
#19 127° 256 mW
#16 330° 185 mW
#21 240° 165 mW
#2 76° 55 mW
#25 120° 164 mW
#20 225° 114 mW

Manuals

Old Hall Setting Documentations

Check Lists

Expert Information